How to Make a Responsibility Assignment Matrix for a Project (Template Included)

ProjectManager

The most important resource you’ll employ to deliver the project is people. They have to fit into the schedule and maintain the project budget. Defining what their roles and responsibilities are when executing tasks and delivering on the project goals is an important part of controlling the project.

How can you coordinate all the people who are involved in a project so they know what they’re doing and don’t block others from doing what they are assigned? Using a responsibility assignment matrix can help. An assignment matrix gives your project a team that gets things done.

What is a Responsibility Assignment Matrix in Project Management?

A responsibility assignment matrix (RAM) is a project management chart used to identify and define the various people and organizations and outline each of their roles in working on tasks or delivering a part of the project.

Project managers use an assignment matrix to clarify what cross-functional teams do within the boundaries of the project and its numerous processes. Sometimes a responsibility assignment matrix is required when responding to a request for proposal (RFP).

The responsibility assignment matrix can also be called a RACI matrix, which stands for responsible, accountable, consulted and informed.

  • Responsible: Notes who is responsible for executing the task, which is then assigned to them.
  • Accountable: Notes who has decision-making authority and how that power is delegated throughout the project team.
  • Consulted: Notes who is able to offer insight into the task, from team members to stakeholders.
  • Informed: Notes who is updated on what in terms of progress and performance, as well as when and how this information is disseminated.

This creates a map of connections between activities and project team members. Depending on the size of the project, there can be several assignment matrices used for various project levels.

Why Create a Responsibility Assignment Matrix?

The assignment matrix identifies what everyone on the team is responsible for, which means not only what their duties are, but how they participate in the project. Some will have defined tasks, others will offer help with work, while there are some who are designated as decision-makers. These groups all have an identity and function within the project to help guide it towards a successful end.

Clear communication leads to more efficient projects. An assignment matrix facilitates better communication between team members and provides transparency by creating a system to make sure everyone is updated and always on the same page. Belaboring communications can bog down a project with too many pointless meetings and confusing interactions in which people try to understand what they’re supposed to be doing. Using the responsibility assignment matrix helps, but having project management software that connects teams in real-time is ideal.

ProjectManager manages project information by allowing teams to attach files directly to tasks, and our unlimited file storage keeps important project documents at your fingertips anywhere, anytime. Commenting on tasks can save time and tagging others in the project team creates a communication process that avoids the pitfalls of redundancies or unnecessary meetings.

Gantt chart screenshot with a team collaboration pop up

When Should a Responsibility Assignment Matrix Be Created?

The responsibility assignment matrix would be created at the start of the project. You’d want to have everyone on the project team aware of where they stand in terms of their involvement before they start executing tasks.

As much as its use is a preventative measure, it can be used prescriptively. If you’re deep into the project and things are not moving as planned, there could be communication gridlock. If team members are not in the loop, or misconstrue what they’re supposed to be doing, using a responsibility assignment matrix might untie up those knots in the communication channel.

If there’s a problem with leadership overruling suggestions on how to advance the project and this is seen as a problem, it’s likely that the roles and responsibilities of the project team need refining. The responsibility assignment matrix defines who has authority to make decisions and using it or revisiting can determine if the right people are in that position.

In fact, any of the definitions might need reexamining at any phase in the project. Perhaps tasks are falling behind schedule. This could be because team members aren’t aware of what tasks they own. Anytime a delay occurs, returning to the assignment matrix is a good first step, even if you went through the process as you should during the planning stage of the project.

How to Create a Responsibility Assignment Matrix

The actual making of a responsibility assignment matrix is not as difficult as getting everyone on board with what their roles and responsibilities are.

Therefore, you want to include your team in the process, get their input and eventually buy-in without spending too much time and energy on the process. Follow these steps to make sure everyone is in agreement and you’ll have a successful responsibility assignment.

  • Identify all the participants involved in the project, from team members to stakeholders and everyone in between.
  • List all deliverables associated with the project. Use a work breakdown structure to make sure you don’t miss any.
  • Meet with team members on how to execute the tasks to create the deliverables. Every task needs to be discussed in terms of the team’s responsibility and authority.
  • Draft the responsibility assignment matrix using a table with the project tasks listed on the left-hand column. Across the top add the name of everyone in the project.
  • Where the tasks meet the project team member, assign whether they’re responsible, accountable, consulted or informed.
  • When completed, share the responsibility assignment matrix with the project team and stakeholders and hold a meeting if necessary to make sure everyone understands their part in the project. If you’re working in a shared space, print out a copy and post it.

Free Responsibility Assignment Matrix Template

Using a RACI template is a shortcut that sets up your team and the project for success. ProjectManager is more than an award-winning software that organizes tasks, teams and projects to streamline work and boost productivity, it’s also the online hub for all things project management.

Among the hundreds of blog posts, guidebooks and tutorial videos are dozens of free templates that can help you through every phase of your project’s life cycle. Using our free RACI template will help you guide all the project teams better, allowing them to know where they stand in relation to the project and what their level of responsibility and accountability is.

Use it at the start of the project to avoid delays and untangle any communicative knots that are preventing the project from progressing as planned. To keep your project on track, download our free RACI template and get a head start on building a workable responsibility assignment matrix.

RACI Matrix Template for Excel

Best Practices

Using our free RACI template is a good start, but you have to make sure you fill it in correctly. A responsibility assignment matrix is only as good as the effort put into creating it. Here are some best practices to apply when you’re in the process of building your assignment matrix.

  • Involve the team: They’re the ones who will be executing the work. You want their input and buy-in to avoid any costly mistakes or time-consuming questions about what wasn’t made clear at the beginning of the project.
  • Identify every single task: Identify all the tasks required to reach your final deliverable. Once you have that thorough list make sure that there is only one person on the team who is accountable.
  • Update your RACI regularly: Make sure that each new one is clearly marked as the most current version and is distributed to everyone on the team. There will be times when you’ll want to revisit the responsibility assignment matrix or changes in personnel will require an edit.
  • Share responsibility viably: One person shouldn’t have to shoulder the bulk of the responsibilities for the project and you want to give authority throughout the project team and not just among the very top management team.
  • Optimize tasks: Managers can use the RACI matrix to see if too many team members have been assigned to a task. Maybe these workers could be spread out for greater productivity. There could be too many people listed as consulted, which slows down the process. The assignment matrix is endlessly useful.

How ProjectManager Helps You Manage Projects Better

ProjectManager is a cloud-based tool that connects everyone in real-time to facilitate planning, monitoring and reporting on the project. It works to give everyone on the project team a job and the knowledge as to where they have authority and when to consult others, as well as defining the reporting process.

Let’s look at the people who are responsible, for example, the team who execute the project. Once invited into the software, you can share the project plan, assign them tasks, add detailed direction, add a deadline and tag for priority and more. The teams can then collaborate by attaching files and images to the tasks and commenting in real-time to work better together.

A screenshot of the Team collaboration user interface in ProjectManager

Those who need to stay informed of the project can do so by also getting invited into the project and sharing plans and schedules with them. Stakeholders can stay updated with reporting features that can generate reports on project variance, cost, time and more with one click. Then share them as a PDF. Reports can even be quickly filtered to zero in on the data stakeholders are interested in.

a screenshot of the status report generation screen in ProjectManager

The responsibility assignment matrix can help you reallocate your resources when things aren’t progressing as planned. Use our software to get further insight. The resource management features include a workload chart that’s color-coded so it’s easy to see who has too many tasks and who can take on more work. Then you can simply reallocate those resources from the workload page to help your team work more productively.

color-coded workload chart

ProjectManager gets you organized, keeps your team focused on their tasks and stakeholders in the loop. Gain efficiencies throughout every aspect of your project’s life cycle with an online Gantt chart to schedule work and kanban boards, a visual workflow feature that provides transparency into production. All that and it’s on a collaborative platform to keep everyone connected. Try ProjectManager today for free.

Click here to browse ProjectManager's free templates

Deliver your projects on time and under budget

Start planning your projects.

AcqNotes

The Defense Acquisition Encyclopedia

Program Management

A Responsibility Assignment Matrix (RAM) describes the participation of various organizations, people, and their roles in completing tasks or deliverables for a project. The Program Manager (PM) uses it to clarify roles and responsibilities in a cross-functional team , projects, and processes. A RAM has four primary assignments: Responsible , Accountable , Consulted , and Informed (also called a RACI matrix).

Definition: A Responsibility Assignment Matrix (RAM) describes the role and responsibilities of various people and/or organizations in completing specific tasks for a project.

Responsible, Accountable, Consulted, and Informed (RACI) Matrix

A RAM is called a Responsible, Accountable, Consulted, and Informed (RACI) matrix. The PMBOK Guide 4th Edition defines RACI as a RAM that illustrates the connections between work packages or activities and project team members. In fundamental terms, RAM refers to the framework in place to distribute duties to individuals where, in a RACI, each team member is assigned a role based on one of the four roles. On larger projects, RAMs can be developed at various levels.

  • Responsible (R): Those who do the work to achieve the task. There is typically one role with a participation type of responsibility, although others can be delegated to assist in the work required.
  • Accountable (A): The one ultimately accountable for the correct and thorough completion of the deliverable or task, and the one to whom Responsible is accountable. In other words, an Accountable must sign off (Approve) on work that Responsible provides. There must be only one Accountable specified for each task or deliverable.
  • Consulted (C): Those whose opinions are sought and with whom there is two-way communication.
  • Informed (I): Those who are kept up-to-date on progress, often only on completion of the task or deliverable, and with whom there is just one-way communication.

Benefit of Utilizing a Responsibility Assignment Matrix (RAM)

The RAM holds substantial advantages for project managers by clarifying the importance of their processes within the team. It fosters a sense of collective contribution among all employees, eliminating the sense of isolation. This project management technique, the RAM, empowers every team member to grasp the broader context of their work. Instead of simply instructing an administrative assistant to collect phone numbers without context, you can refer them to this valuable resource. By using the RAM, employees become more engaged in achieving positive results as they comprehend the alignment of their contributions with the company’s overall operations.

Responsibility Assignment Matrix (RAM) Goal in Project Management

A RAM is used in project management as a communication tool to ensure that work tasks are designated as a responsible agent. A RAM can define what a project team is responsible for within each component of the Work Breakdown Structure (WBS) . It could also be used within a working group to designate roles, responsibilities, and levels of authority for specific activities. The matrix format shows all activities associated with one person and all people associated with one activity. This ensures that only one person is accountable for any task to avoid confusion.

Responsibility Assignment Matrix (RAM) Tutorial

Responsibility Assignment Matrix (RAM) Standard Format

A RAM is displayed as a chart that illustrates the interaction between work packages that need to be done and project team members. Typically, the list of objectives is on the left-hand column with the project team member names across the top. Each work package will be assigned to the appropriate project team member. The chart aids in communication among the project team members.

No one should typically have more than one degree of responsibility for any given deliverable or activity group in the RAM chart. To simplify things, we’ve assigned each participant in this scenario a certain amount of commitment. However, there is frequently white space when you create a genuine model for more than four people. In some situations, it’s okay to have someone with secondary responsibility but not primary.

Responsibility Assignment Matrix (RAM) Template

Template: responsibility assignment matrix (ram) (excel), 6 steps to developing a responsibility assignment matrix (ram).

Below is a list of the 6 (six) most common steps in developing a Responsibility Assignment Matrix (RAM).

  • Step 1: List all project tasks and deliverables
  • Step 2: Identify all project stakeholders
  • Step 3: Determine the responsibility and accountability level for each task and deliverable
  • Step 4: Assign stakeholders to each task
  • Step 5: Assign overall stakeholder
  • Step 6: Ensure all stakeholder know their responsibility

Developing Responsibility Assignment Matrix (RAM) Matrix Best Practices

Below is a list of best practice topics that can help Program Managers effectively build and use a Responsibility Assignment Matrix.

  • One stakeholder is in charge per task.
  • The least amount of people accountable, the better.
  • Be Efficient with Meetings.
  • Constant Communication.
  • Stakeholders agree on final RAM

Responsibility Assignment Matrix (RAM) Lessons Learned

A Responsibility Assignment Matrix (RAM) is a tool used in project management to identify and clarify the roles and responsibilities of the different people or groups working on a project. The goal of making a RAM is to make sure that all tasks are done and that responsibilities don’t overlap or get missed. Here are some things you can learn to make sure your RAM is built right:

  • Define the project’s goals and scope in detail:  Before making a RAM, it’s important to have a clear idea of the project’s goals and scope. This will help make sure that all necessary tasks are included and that the responsibilities are in line with the overall project goals.
  • Find out who all the stakeholders are and what their roles are:  A RAM should have a list of all the people or groups involved in the project, such as internal team members, external partners, and customers. There should be roles and responsibilities for each stakeholder.
  • Give each stakeholder specific tasks and responsibilities:  Instead of giving each stakeholder a general role, it is important to give them specific tasks and responsibilities. This will help make sure that no one’s responsibilities get mixed up or left out.
  • Make sure that all stakeholders know about and understand the RAM:  It is important to make sure that all stakeholders know about and understand the RAM. This can be done by having regular meetings and giving updates, as well as by putting the RAM in writing.
  • Review and update the RAM often: As the project moves forward, it may be necessary to review and update the RAM. This can help make sure that the RAM stays correct and helps the project reach its goals.

Difference Between a Responsibility Assignment Matrix (RMA) and a Responsible, Accountable, Consulted, and Informed (RACI) Matrix

The PMBOK Guide 4th Edition defines RACI as a RAM that is used to illustrate the connections between work packages in a Work Breakdown Structure (WBS) and project team members. The difference between a RAM matrix and RACI matrix is:

  • A Responsibility Assignment Matrix (RAM) describes the participation of various organizations, people, and their roles in completing tasks or deliverables in a Work Break Down Structure (WBS) for a project.
  • A Responsible, Accountable, Consulted, and Informed (RACI) matrix is used on projects where multiple groups of people as assigned a task. It helps on larger projects with a lot of people and organizations. It also helps with outside stakeholders and their responsibilities on a project.
  • A RACI can have multiple RAM within it.

AcqLinks and References:

  • Template: Responsibility Assignment Matrix (RAM) Template (Word)
  • Template: Responsibility Assignment Matrix (RAM) Template (Excel)

Updated: 1/11/2024

Leave a Reply

You must be logged in to post a comment.

responsibility assignment matrix (ram)

project-management.com logo.

Popular Insights:

Best Project Management Software

Mind Mapping Software

What Is a RACI Matrix?

Lauren Good Avatar

Share this Article:

Our content and product recommendations are editorially independent. We may make money when you click links to our partners. Learn more in our  Editorial & Advertising Policy .

Key takeaways

Successful project management depends on a team-wide understanding of roles and responsibilities. Using a RACI matrix to assign and define each role is a great way to keep a project on track and positioned for success.

Featured Partners

{{ POSITION }}. {{ TITLE }}

{{ TITLE }}

How Does a RACI Chart Help Project Managers?

Project managers use RACI charts to keep track of team roles and relay those responsibilities to the larger team. The matrix defines clear roles and responsibilities for individual team members across the various phases of the project, breaking each role down into four types of designation: those who are Responsible and Accountable for project deliverables, those who should be Consulted as work begins, and stakeholders who need to be Informed of ongoing progress, roadblocks, and updates. 

Read more: Project Management Phases

RACI Matrix Definitions 

Responsible.

The individual(s) with responsibility for the task or deliverable is typically responsible for developing and completing the project deliverables themselves. The responsible parties are typically hands-on team members who make direct contributions toward the completion of the project. The responsible team is comprised of the project’s “doers”, working hands-on to ensure that each deliverable is completed. 

Some examples of responsible parties are:

  • Project Managers
  • Business Analysts
  • Graphic Designers
  • Copywriters

Accountable

Accountable parties ensure accountability to project deadlines, and ultimately, accountability to project completion. This group frequently also falls under the informed category.

Some examples of accountable parties are:

  • Product Owners
  • Signature Authorities
  • Business Owners
  • Key Stakeholders

Consulted individuals’ opinions are crucial, and their feedback needs to be considered at every step of the game. These individuals provide guidance that is often a prerequisite to other project tasks, for example, providing legal guidance on a project throughout the process. If you are working on new product development or expansion, this could essentially be the entire organization.

Some examples of consulted parties are:

  • Legal Experts
  • Information Security and Cybersecurity Experts
  • Compliance Consultants

Informed persons are those that need to stay in the loop of communication throughout the project. These individuals do not have to be consulted or be a part of the decision-making, but they should be made aware of all project updates. Typically, this party are business owners or stakeholders that are more interested in viewing the project at a 30,000-foot view.  Keep this group on your cc list for awareness of topics, decisions, and progress – that includes making them part of the initial project kickoff and project demos as optional attendees. This group often also falls under the accountable group.

Some examples of informed parties are:

  • Project Committee Members
  • External Stakeholders

Read more: DACI vs RACI Model Guide

Why Are RACI Roles Important?

RACI roles provide a sense of organization and clarity for teams that are looking to divide roles and keep team members accountable for their contributions. Considering that 27% of projects go over budget, for reasons like scope creep and lack of defined roles, RACI roles help position a project for success and avoid common pitfalls. 

Moreover, RACI roles help ensure that communication between all roles is ongoing. When you consider that nearly half of all project spending is at risk of being wasted due to a lack of effective team-based communication, it becomes all that more important to prioritize. Ultimately, teams who prioritize communication and well-defined roles are better off, and RACI roles help teams achieve that goal faster – while providing accountability for each team member’s unique contributions to the success of the project. 

Read More: Top 10 Main Causes of Project Failure

How to Create a RACI Matrix 

If you’re looking to implement a RACI matrix as part of your team’s project planning process, take these steps to create a RACI matrix.

Ensure that you have a thorough understanding of the project and its demands before outlining any further steps by communicating with key stakeholders and decision-makers.

Determine the list of key activities and deliverables from the director of program management or other leadership. 

Determine who is needed to be a part of the project or initiative.

Determine the project roles and responsible job titles and persons for each activity and deliverable.

Hold review sessions with key members of the team for alignment, and if you haven’t already, host a kickoff meeting with the entirety of the team and key stakeholders to unveil the matrix, address questions, and more. 

If the project has already started, it’s not too late to implement a RACI matrix.

  • Outline the story. Using research from multiple sources, do a, b, c, and d.
  • Utilize steps 2 and 3 (shown above). Ensure the right groups are assigned and engaged. 
  • Hold a review session. Ensure that the team acknowledges and discusses the plan and the roles assigned.

Read more: 8 Factors That Lead to Successful Projec ts

Examples of a RACI Matrix

RACI matrix example.

As shown above, a RACI matrix helps break down what roles individuals will play as work is carried out and to what extent they will be involved in the project overall. The horizontal axis represents each person on the project team and the vertical axis represents each task.

Each square of the matrix represents an individual, a task, and that individual’s role within the project, either responsible, accountable, consulted, or informed. In this situation, for example, the project manager is accountable for accessing risk, defining performance requirements, creating designs, executing construction, and approving construction work. However, they are only informed about approving construction work and defining functional and aesthetic needs.

Read more: Understanding Different Types of Stakeholders and Their Roles

Our FREE Downloadable RACI Matrix Template

Who creates the raci matrix.

The RACI matrix — sometimes called RACI model, RACI diagram, or simply just RAC — is created by the project manager at the start of the project as a key part of establishing the initial human resources planning for the project. Because miscommunication is a common threat to any project, RACI charts are a great asset to teams dealing with any type of project, from very simple projects to extremely complex ones. 

Common Mistakes When Creating a RACI Matrix

  • Failure to plan ahead: Utilizing a RACI matrix should not be your first step in project planning. Having a fully assembled project team and at least a general idea of a task list and project plans is a better place to start before preparing a matrix.
  • Working with too large a team: A RACI matrix is likely not the best bet for a large team, as it will make the matrix hard to understand and overly complex.
  • Not communicating with the project team: A RACI matrix should help organize tasks and responsibilities that have already been introduced to the project team – no one likes to be blindsided. Be sure to host a kickoff meeting with the team first before creating a RACI matrix.

Frequently Asked Questions

Implementing a RACI matrix takes more than just a few emails and sporadic conversations – it takes consistent communication and planning. You should host a kickoff meeting to introduce the matrix to the team and make a plan to continue meeting at predetermined times throughout the project lifecycle. 

Here are a few more tips to keep in mind as you implement your RACI matrix within the team dynamic:

  • Get everyone prepared. Send the document around to the meeting distribution as read-ahead material, requesting feedback if there are any major concerns. 
  • Roll out each role for the team . During the meeting, conduct a review of the tasks and responsible parties. Do not rush through this review, but rather ensure enough time in your project kickoff for this important aspect. (Be certain to clarify the definitions of RACI to avoid ambiguity.)
  • Consider changes and update accordingly. After the meeting, send out the notes documenting acceptance or updates to the RACI. In addition to sending out the notes, request any corrections within a reasonable yet defined timeframe. Clarify that if no changes are requested, each person is acknowledging their role and committing to the project tasks as outlined.
  • Stay in touch. Consider a quick review with the entire team each quarter or every six months for longer projects to ensure it remains up-to-date and not simply another document in the repository but a relied-upon artifact.

As you implement the RACI matrix…

  • Encourage teamwork and foster collaboration whenever possible.
  • Don’t fear updates – make changes and adjustments as needed (but be sure to communicate those changes clearly to all parties).
  • Earlier is better. Roll out your matrix plan to the team BEFORE you plan to implement it for the best results. 
  • Have a clear-cut understanding of the project scope and how each role connects to the overall project goal.

For “Responsible” Parties:

  • Make sure your project’s definition of Responsible is clear on who holds the “decider” role for the project or project phase’s completion, and what the dimensions of that responsibility will be.
  • Ensure that all parties are aware of their role and responsibilities within the matrix.

For “Accountable” Parties: 

  • When multiple Accountable team members must exist, use your definitions to make clear which individual is accountable for a given project element, and how that individual needs to interact with other Accountable team members.
  • Ensure that there is only one “Accountable” party assigned per task.
  • Be sure that the Accountable party has the authority and power to oversee the task as the accountable party.

For Consulted and Informed Parties: 

  • Consulted parties are often high-level decision-makers with heavy schedules. Make sure you’re clear on their availability ahead of time.
  • Similar to Consulted parties, Informed parties are often less hands-on and have less understanding of day-to-day project operations. As the project goes on, make sure to keep detailed notes to keep the Informed party up-to-date on key information. 
  • Understand the ways that these parties like to communicate and create a plan to reach them early – whether that’s over phone calls, emails, video calls, or from within your project management system’s collaboration tools.
  • Knowing the difference between who needs to be consulted versus informed can be a challenge if there is ambiguity about project roles. Consider what aspects of the project different team members need to know to do their jobs, and then bake those into your definitions.

RACI Matrix Pros & Cons

  • Increased Engagement: RACI helps engage project participants in the project lifecycle. 
  • Enhanced Project Planning: Project managers make project planning more organized, efficient, and detailed.
  • Identifiable Improvement Opportunities: Areas of improvement are more easily identified.
  • Easier Collaboration: Use of a RACI matrix creates a clear path for leadership to sign off on project steps, as project documentation in the RACI model is heavily emphasized.
  • Better Communication: Improves overall group communication as a whole.
  • Group Accountability: Assists groups, especially larger project teams, stay connected and accountable to their roles and project goals
  • Limitations on Role Scope: The RACI model does not provide details on role scope, especially for responsible parties. These gaps in detail also affect other team roles, for example, another gap in a RACI is the determination of who is responsible for verifier and signatory.
  • Limits on Task Details and Scope: While a RACI matrix can provide an overview of who is responsible for different tasks, it will not state what needs to be done.
  • Not Aligned to the Agile Methodology: Project managers using an agile methodology like scrum may find it redundant since accountability, ownership, and ongoing communication is built into the scrum framework (i.e., product owner, scrum master, and daily standups with the team). Additionally, agile focuses on team-based delivery and accountability, while the RACI framework and alternatives focus on individual responsibility and autonomous accountability.

Read more: Top 10 Causes of Project Failure

Free RACI Matrix Templates

A number of project management software solutions include a native RACI matrix template. Here are just a few we’ve found:

Colorful RACI Chart Template

We love this template from Smartsheet because it’s colorful, thorough, and includes room for every party involved in the project. 

RACI template from smartsheet.com.

Pastel Colored RACI Matrix Template

This template from the Academy to Innovate HR is a great choice for project managers who want to organize their team roles with an easy-on-the-eyes chart that evolves beyond the simple spreadsheet. 

RACI matrix template from the Academy to Innovate HR.

Simple RACI Chart from Clickup

These RACI templates from Clickup have enough variety to fit any of your project needs, but are simple enough for even beginner PMs to use.

A simple RACI matrix from clickup.com.

Detailed RACI Matrix Template

This template is a great starter template for anyone looking to explore RACI charts in their project management strategy . As an added bonus – it comes with the RACI definitions already built in!

A detailed RACI matrix template from Vertex42.

Excel-Based RACI Chart Template

Are you an Excel or Google Sheets user looking to take advantage of the RACI matrix? An Excel-formatted template from Project Management Docs can be just the solution for you. This template is a great template for users who want a chart that comes in a pre-formatted structure.

An Excel spreadsheet-based RACI matrix from projectmanagementdocs.com

Sign up for our emails and be the first to see helpful how-tos, insider tips & tricks, and a collection of templates & tools. Subscribe Now

{{ TITLE }}

You should also read.

Creating Gantt Charts in Microsoft Project: Ultimate Guide

Creating Gantt Charts in Microsoft Project: Ultimate Guide

Project Executive: Roles, Responsibilities, and How to Become One

Project Executive: Roles, Responsibilities, and How to Become One

What Is Cost-Benefit Analysis: A Practical Guide

What Is Cost-Benefit Analysis: A Practical Guide

Join our newsletter.

Subscribe to Project Management Insider for best practices, reviews and resources.

By clicking the button you agree of the privacy policy

Lauren Good Avatar

Get the Newsletter

You might also like.

83 Project Management Terms & Concepts to Know

83 Project Management Terms & Concepts to Know

Shelby Hiter Avatar

What Is a Problem Statement & How to Effectively Create One

J.R. Johnivan Avatar

How to Hire the Best Project Manager

Anne M. Carroll Avatar

loading

How it works

For Business

Join Mind Tools

Article • 6 min read

The Responsibility Assignment Matrix (RAM)

Knowing where the buck ultimately stops.

By the Mind Tools Content Team

responsibility assignment matrix (ram)

It takes a lot of effort to keep a large project running smoothly. With a large number of variables, people, and deliverables, it’s hard to keep on top of everything that’s happening. Consider the following scenario:

Hal (the distressed project manager): "What do you mean, we don’t have the test results yet?! What has Katy been doing? Get Katy!"

Katy: "No, Hal, I wasn’t responsible for getting that done. Joan has more expertise in that area, remember? I’ll ask Joan what happened."

Joan: "Gee, Katy, I know I have more experience with these reports, but I was waiting for you to contact me so we could review them together."

Do you recognize anyone you know? This type of situation is repeated daily in organizations across the globe. And most of the time, there’s no incompetence or bad intentions involved. More often, problems like this are the result of inadequate planning and poor communication.

Successful projects have a clear breakdown of who is ultimately responsible for each aspect of the project. Without clear, written, and agreed-upon accountability, it’s far too easy to for communication to fail and for responsibilities to be muddled.

So how do you avoid this?

Developing a Responsibility Assignment Matrix

One tool that project managers use to keep these assignments clear is the Responsibility Assignment Matrix (also called the RAM, or the Responsibility Matrix). This matches deliverables with the people who are responsible for them. For every piece of the project, the matrix shows who needs to contribute what for the project to be completed.

For example, let’s say that you’re upgrading your customer service delivery system, and you need to train your staff to use new procedures and tools.

Step One: Define Your Deliverables

Using a Work Breakdown Structure , you define three key deliverables for this training project, with a few subcategories for each:

  • Survey current practice.
  • Define new practice.
  • Locate resources.
  • Prepare training schedule.
  • Manage training.
  • Re-survey practices after implementation.
  • Analyze results.

responsibility assignment matrix (ram)

A Work Breakdown Structure (WBS) is a project planning tool used to break a project down into smaller, more manageable pieces of work (deliverables). It's not a list of every task: rather, it's a "tree" structure showing the meaningful groups of activities that make up the main segments of the project.

Step Two: Identify the People Involved

Map out who is on your project team. By creating a chart of individuals who are available, you can then delegate work assignments based on expertise, and you can recruit talent that you’re missing. This step is often called an “Organization Breakdown Structure” because it creates an organizational chart for your team.

responsibility assignment matrix (ram)

Step Three: Create Your Responsibility Matrix

Draw a matrix. The deliverables are the column headings, and the people are the row titles.

With your team, determine accountabilities as well as other levels of involvement for each item in your Work Breakdown Structure.

A useful framework to determine role assignments is RACI . This defines four levels of involvement:

R = Responsible (People who do the work). A = Accountable (People who make sure the work gets done). C = Consulted (People who provide input before and during the work). I = Informed (People who are kept informed of progress).

Project Management Institute, "A Guide to the Project Management Body of Knowledge (PMBOK Guide)" – Fifth Edition, (2013). Copyright and all rights reserved. Material from this publication has been reproduced with the permission of PMI.

Other levels of involvement may include “assist”, “coordinate”, “sign off”, and “review”. You can decide how to assign responsibility for your project and your team. But you must be sure that ultimate accountability and responsibility for performing the work are agreed upon and communicated.

Step Four: Communicate

When your Responsibility Assignment Matrix is complete, communicate it to all stakeholders. It’s a good idea to post it in an area where people will see it. Used effectively, the RAM helps people understand what they should be doing at all stages of the project.

Project teams can easily lose focus on what needs to be done and who needs to do it. People may assume that somebody else is doing something – and before long, key pieces of work fall behind schedule.

To avoid this common problem, consider developing a Responsibility Assignment Matrix for your team. This matrix clearly identifies which role each team member has agreed to take on for each of the project’s main deliverables.

With these assignments, you can eliminate miscommunication about who’s doing what – and you can help to ensure that your project is successful.

You've accessed 1 of your 2 free resources.

Get unlimited access

Discover more content

How to avoid getting overwhelmed at work.

Control and Influence What You Can, Accept What You Can't

How to Guides

How To Step Up From Peer To Leader

Five Ways to Survive And Thrive as a New Boss

Add comment

Comments (0)

Be the first to comment!

responsibility assignment matrix (ram)

Get 30% off your first year of Mind Tools

Great teams begin with empowered leaders. Our tools and resources offer the support to let you flourish into leadership. Join today!

Sign-up to our newsletter

Subscribing to the Mind Tools newsletter will keep you up-to-date with our latest updates and newest resources.

Subscribe now

Business Skills

Personal Development

Leadership and Management

Member Extras

Most Popular

Latest Updates

Article a02gru8

Tips for Creating an Inclusive Culture

Article aczodqf

NEW! Meaningful Conversations

Mind Tools Store

About Mind Tools Content

Discover something new today

Pain points - managing new hires.

Getting onboarding right

Managing the 4Ps of Delegates

Turning Passengers, Protesters and Prisoners into Participants

How Emotionally Intelligent Are You?

Boosting Your People Skills

Self-Assessment

What's Your Leadership Style?

Learn About the Strengths and Weaknesses of the Way You Like to Lead

Recommended for you

4 steps to find your unique selling proposition.

USP Analysis

Business Operations and Process Management

Strategy Tools

Customer Service

Business Ethics and Values

Handling Information and Data

Project Management

Knowledge Management

Self-Development and Goal Setting

Time Management

Presentation Skills

Learning Skills

Career Skills

Communication Skills

Negotiation, Persuasion and Influence

Working With Others

Difficult Conversations

Creativity Tools

Self-Management

Work-Life Balance

Stress Management and Wellbeing

Coaching and Mentoring

Change Management

Team Management

Managing Conflict

Delegation and Empowerment

Performance Management

Leadership Skills

Developing Your Team

Talent Management

Problem Solving

Decision Making

Member Podcast

language-selector

What is a Responsibility Assignment Matrix (RAM) in Project Management?

  • 1.  Project Management Basics
  • 2.  Project Management Methodologies
  • 3.  Project Management Life Cycle
  • 4.  Best Project Management Software
  • 5.  Team Collaboration Tips
  • 6.  Agile Methodology Basics
  • 7.  Agile Project Management Tools & Techniques
  • 8.  Project Management Frameworks
  • 9.  Resources
  • 10.  Glossary
  • Advanced Terminology
  • Methodologies
  • PM Software Features
  • Basic Terminology
  • Professional Development
  • Agile Project Management

Introduction to Responsibility Assignment Matrix (RAM)

Project management is a complex process that involves multiple stakeholders, tasks, and resources. To ensure the success of a project, it is crucial to assign clear roles and responsibilities to team members and accurately define their tasks. 

One tool that can help project managers achieve this goal is the Responsibility Assignment Matrix (RAM). In this article, we will explore the definition and benefits of RAM, as well as some examples.

If you’re looking for a RAM template that will help you assign roles and clarify responsibilities, Wrike has a customizable template ready to go.

What is a Responsibility Assignment Matrix (RAM) in project management?

A responsibility assignment matrix (RAM) in project management, also known as a RACI chart or RACI matrix, details all the necessary stakeholders and clarifies responsibilities amongst cross-functional teams and their involvement level in a project. RACI stands for Responsible, Accountable, Consulted, and Informed and each letter corresponds to a team member.

A RAM in project management should be referred to by all parties throughout a project because it helps plan an individual’s roles and responsibilities before work begins. A RACI matrix ensures all stakeholders know who is responsible for completing a task or getting feedback on deliverables.

The four roles are broken down as follows:

  • Responsible: The person(s) completing the task
  • Accountable: The team member coordinating the actions, making decisions, and delegating to those responsible for the task
  • Consulted: The person(s) who will be communicated with regarding decisions and tasks
  • Informed: The person(s) who will be updated during the project and upon completion

Read more about RACI here . 

Identify and visualize roles seamlessly with Wrike

Responsibility assignment matrix example.

A common RAM   template looks like the example below. Notice how all stakeholders can have more than one role:

undefined

Responsibility Assignment Matrix template

Below you can see a powerful RAM template . The chart helps with visualizing roles and workload clearly. Therefore, project managers and team members follow the progress easily and stay on track.

undefined

Clarify roles with Wrike

In conclusion, RAM is a useful tool for any project manager who wants to ensure their team is clear on their responsibilities. It helps to establish a structured approach to project management, allowing for better communication, accountability, and ultimately, project success.

Using Wrike’s pre-built template, you can define the roles of each team member so everybody is on the same page. The template will also help you balance your workload and create complete transparency on your team structure.

What is a RACI Chart?

Basic Project Management

  • Project Charter
  • Project Management Stakeholders
  • What is a Project?
  • Work Breakdown Structure
  • Project Objectives
  • Project Baseline
  • Project Management Scheduling
  • Project Management Work Packages
  • Project Management Scope
  • Scope Creep

Advanced Project Management

  • What is PERT?
  • Network Diagram
  • Risk Management
  • Cost Estimation
  • Feasibility Study
  • Monte Carlo Analysis
  • Project Integration
  • Cost Management
  • PMI Project Management
  • What To Do With Certification
  • Certification
  • Become Certified
  • PMP Certification
  • Best Certification

Software Features

  • Critical Success Factors
  • Capacity Planning
  • User Role Access Permissions
  • Time Tracking
  • Budget Tracking
  • Request Forms
  • Work Assignments
  • Version Control
  • Dependency Managements
  • Project management Milestones
  • Project Management Software
  • Project Management Tools
  • Project Management System
  • Gantt Charts

responsibility assignment matrix (ram)

How to Make a Responsibility Assignment Matrix: Excel RACI Template

responsibility assignment matrix (ram)

What is a responsibility assignment matrix?

How to create a responsibility assignment matrix in excel, free raci template for excel, how to manage raci roles in your teamgantt plan.

A responsibility assignment matrix (RAM) is a tool used in project management to clarify team and stakeholder roles for each project step. It paves the way for smooth collaboration by ensuring everyone knows what they need to do, who they need to talk to, and who has the final say on key decisions and deliverables.

RACI—which stands for Responsible , Accountable , Consulted , Informed —is the most popular framework used for assigning roles and responsibilities on projects. Here’s a quick breakdown of RACI categories in basic terms:

  • Responsible : Who completes the work?
  • Accountable : Who makes decisions? 
  • Consulted : Who provides expertise?
  • Informed : Who needs status updates?

Of course, RACI isn’t the only responsibility assignment matrix out there. These RACI alternatives provide a small sample of other approaches you might come across in project management.

  • RASCI (or RASIC) matrix : This RACI alternative adds one extra role into the responsibility assignment mix. In the RASCI model, the S stands for Supportive . While this role covers anyone who will lend the Responsible person a hand with the work, a Supportive team member isn’t responsible for the outcome.
  • DACI matrix : DACI stands for Driver , Approver , Contributor , Informed and is used to outline decision-making roles and responsibilities for projects. In this framework, the project manager or leader typically serves as the Driver guiding the team to a decision.‍
  • RAPID responsibility matrix : RAPID stands for Recommend , Agree , Perform , Input , Decide and is another decision-making framework used to define authority vs accountability. The Recommend role kicks things off by suggesting an action, while the Decide role has the ultimate say in how things move forward. ‍
  • CARS : CARS stands for Communicate , Approver , Responsible , Support . In this model, Communicate combines RACI’s Consulted and Informed roles into a single assignment. Someone with the Communicate role lends their expertise and needs to be kept up-to-date on progress. The Approver is the main decision-maker who calls the shots.

Lay a clear path to success with a visual plan that’s easy to understand, and keep everyone in sync with flexible workflows and team collaboration.

responsibility assignment matrix (ram)

Lots of people use spreadsheets to make a responsibility assignment matrix for their projects, so let’s walk through the basic steps of building one in Excel, using the RACI framework as our model.

Looking for an online solution? See how TeamGantt's RACI feature integrates into your project plan.

1. List project tasks and deliverables in column A

First, make a list of all the work that needs to be done for your project down the left side of your matrix. Enter each project task, milestone, or decision in column A of your Excel worksheet. 

Feel free to group tasks by project phase like we’ve done in the screenshot below. That way, your RACI matrix is easy to scan and read.

Excel RACI Matrix Step 1 - List project tasks and deliverables

2. Add team members or project roles across row 1

Starting with column B, label each column header with the name of a team member and/or project role. 

Include the people who will execute and review work for the project, as well as any subject matter experts or stakeholders you may need to consult or keep in the loop along the way.

Excel RACI Matrix Step 2 - Add project role and team member names

3. Insert a new worksheet for roles and definitions

Click Insert > Insert Sheet from the Home ribbon at the top of your Excel workbook.

Excel RACI Matrix Step 3a - Insert new sheet for roles and definitions

Go to your new worksheet, and list each letter of the RACI acronym in column A. Then enter the corresponding role for each letter in column B. We also included RACI definitions in column C as a handy reference for anyone who might need a refresher.

Excel RACI Matrix Step 3b - Enter roles and definitions

You’ll use this worksheet to populate a drop-down list on the main RACI matrix tab to make it easier to assign roles quickly.

4. Add a drop-down list of roles to your matrix

Now, go back to your main worksheet, and click into the first open cell in your matrix.

On the ribbon, click Data > Data validation to insert a drop-down list with RACI roles.

Excel RACI Matrix Step 4a - Click Data Validation

On the Settings tab, choose List under the Allow menu.

Excel RACI Matrix Step 4b - Select allow list setting

Click into the Source field, then highlight the data range with your options from the RACI Roles & Definitions worksheet you set up in Step 3. We highlighted cells A2-A5 in our example.

Excel RACI Matrix Step 4c - Select data source

Verify your Data validation settings are correct, then hit Enter to add the drop-down list to your selected cell.

Excel RACI Matrix Step 4d - Confirm data validation settings

Copy and paste that cell to apply the drop-down list to other cells in your RACI matrix worksheet.

5. Color-code assignments with conditional formatting

Click Conditional Formatting > New Rule on the Home tab. Select Classic > Format only cells that contain > Specific text > containing . Enter the letter R in the text box, then choose Custom Format , and apply a background color (and any other styles you want). 

Repeat this step for each additional letter in the acronym.

Excel RACI Matrix Step 5 - Color-code responsibility assignments with conditional formatting

6. Assign a RACI value to everyone on every task

You’re almost there! Now go down the list of tasks on your responsibility assignment matrix, and assign a role to every person who will be involved in that project step or deliverable.

Excel RACI Matrix Step 6 - Assign a role to everyone on every task

Want to build a responsibility assignment matrix of your own, but don't want to start from scratch? Download our ready-made Excel template for free. This blank RACI template is fully editable, so you can customize it for any project you manage. 

We added drop-downs for assigning RACI roles more easily and included a RACI chart example tab as reference in case you need a little extra guidance.

Download: RACI matrix template for Excel

Free RACI Template for Excel by TeamGantt

You can easily upload your final matrix to your TeamGantt project . But if you don’t want to worry about outdated spreadsheets that get forgotten once work begins, why not assign RACI roles directly to your plan?

Here’s how to use TeamGantt’s online RACI feature for your next project.

Assigning RACI roles and responsibilities to TeamGantt tasks

  • Open your project, and toggle to the RACI tab. This will display all your project tasks in a list format (rows). On the right side of the matrix, you’ll see a column for each person currently invited to the project with cells for each task in the project. 
  • Click the cell below each person who needs to be assigned a role on a task, and choose one of the RACI options from the drop-down.

Screenshot of TeamGantt's built-in RACI matrix for assigning task responsibilities

Viewing RACI matrix assignments for your project

There are 2 simple ways to view RACI assignments in TeamGantt:

  • From the Gantt tab : If someone is assigned to a task and has a RACI role on that task, the RACI value will appear in parentheses next to that person’s name on the gantt chart. Just be aware that you won’t see RACI assignments for people who haven’t been assigned to a specific task in Gantt view.

Screenshot of RACI roles in a TeamGantt timeline

  • From the RACI tab : To access your project’s full RACI matrix, simply toggle to the RACI tab for that project. You’ll find RACI assignments for every person playing a role—whether or not they’re the one responsible for doing the work.

Screenshot of the RACI tab in a TeamGantt project

Keep teams in sync—and accountable—with TeamGantt

A responsibility assignment matrix is a simple tool that makes projects easier to manage by creating less confusion and more accountability. But you’ve got more than roles and responsibilities to keep straight.

TeamGantt makes it easy to build a project plan your whole team can contribute to and collaborate on. Everything happens online, so you can stay on top of deadlines and monitor progress in real time.

Use our built-in RACI chart to assign roles and keep them visible from project start to finish, so everyone knows how they contribute to success.

Try TeamGantt’s Pro Manager plan free for 30 days!

responsibility assignment matrix (ram)

  • Memberships

Responsibility Assignment Matrix (RAM)

Responsibilty Assignment Matrix - Toolshero

Responsibility Assignment Matrix: this article explains the Responsibility Assignment Matrix in a practical way. After reading you will understand the basics of this powerful project management tool used by management professionals. This article also contains a downloadable and editable Responsibility Assignment Matrix template and a free in-depth explanation video.

What is the Responsibility Assignment Matrix or RAM?

Project managers like using a RAM to identify the role of the various members of a project team. This matrix is a structural chart in which is visually made clear (on paper or through project management software) what should be done by whom in cross functional or departmental projects.

In the matrix it is clear what the project tasks, roles and responsibilities are of each of the project team members. It is also referred to as the RACI matrix , VERI matrix or Linear Responsibility Chart (LCR).

Free Toolshero ebook

It’s often used as an integral part of the Work Breakdown Structure .

RAM video (1-Minute Skill Booster)

Our 1-Minute Skill Booster below will help you get a quick overview on the RAM and at the end of this article you will find an in-depth video on this project management tool.

Responsibility Assignment Matrix example

Despite the simple nature of all information in the matrix memory, it can be very time-consuming to assign each member of the project team with the right tasks and responsibilities.

In addition the appropriate roles must be defined in advance before they are included in the RAM.

RACI Matrix example - toolshero

Figure 1 – The Responsibility Assignment Matrix (RAM) / RACI Matrix

To do this well and accurately, the matrix can be completed using the following steps:

  • Step 1: Identify all the participants and (facilities) supporters of the project.
  • Step 2: Identify all the deliverables for the project.
  • Step 3: Discuss with all team members how they can support each other to achieve the best performance. It is important to define each participant’s responsibilities so that there will be no misunderstandings on who is responsible for completing the tasks at hand.
  • Step 4: The initial draft of the RAM is created, with the activities in the left-hand column and the team members in the project in the first right-hand column. Enter the roles that each person will have in the cells that have been formed. An example of this can be seen in the form of a RACI chart (Responsible, Accountable, Consulted and Informed) above. Note that only one person can be accountable for each task.
  • Step 5: Have the participants in the project approve the RAM (in writing). Again to prevent misunderstandings.
  • Step 6: Any remarks on changes in the RAM can be filed by the participants in writing. Finally, the responsibility assignment matrix will be reviewed and after approval has been obtained, the project can start.
  • Step 7: Interim assessment is important. When it appears that it is better to adjust the RAM, you will have to go back to step 3 and the adjustments must be discussed with all team members.

Responsibility Assignment Matrix and complex projects

The RAM is also suitable for complex projects. When activities are overlooked and the matrix contains incomplete and/or inaccurate information, this will lead to duplicated efforts.

It is therefore advisable to ensure that all information is included in the matrix and that all information is and remains accurate.

The following suggestions contribute to a larger chance of success of a matrix in a complex project:

1. Hierarchy of charts

Divide the RAM into separate graphs so that a distinction can be made according to priorities .

The RAM with the highest levels identifies the high-priority activities within the project.

From this point RAM-graphs can be developed that have been derived from this higher level.

2. Involvement

By involving all the members of the project team in the development of the RAM, they will know exactly what is expected of them and they will participate and be (more) committed to using their own specializations.

3. Written representation

By putting the RAM in writing, any mistakes or problems can be identified.

Moreover, the participants in the project will have a better understanding of what their joint participation in the project is.

Role identification

In a RAM the role of the individual and the role of the group are not separated. The role describes the participation with accompanying tasks of the individual in the project.

Such a role can be performed by several people in a group.

Vice versa, one person may have several roles in the project. This is why several employees can have the role of project manager and one individual may have the role of manager and task performer.

Responsibility Assignment Matrix template

Start visualizing what the tasks and responsibilities are of each team member with this ready to use RAM template.

Download the Responsibility Assignment Matrix template

Responsibility assignment matrix (ram) video (in depth-explainer).

Watch the in-depth video below for a recap of what you’ve just read, so you will remember it more easily!

Join the Toolshero community

It’s Your Turn

What do you think? Is the Responsibility Assignment Matrix in today’s modern project- and stakeholder management? Do you recognize the practical explanation or do you have more additions? What are your success factors for good stakeholder management during a project?

Share your experience and knowledge in the comments box below.

More information

  • Project Management Institute (2010). A Guide to the Project Management Body of Knowledge ( PMBOK Guide) . PMI Standards Committee.
  • Baker, D. (2009). Multi-Company Project Management: Maximizing Business Results Through Strategic Collaboration . J Ross.
  • Cleland, D. and Ireland, L. (2006). Project management: strategic design and implementation . McGraw-Hill .

How to cite this article: Mulder, P. (2012). Responsibility Assignment Matrix (RAM) . Retrieved [insert date] from Toolshero: https://www.toolshero.com/project-management/responsibility-assignment-matrix/

Original publication date:: 03/26/2012 | Last update: 02/28/2024

Add a link to this page on your website: <a href=”https://www.toolshero.com/project-management/responsibility-assignment-matrix/”>Toolshero: Responsibility Assignment Matrix (RAM)</a>

Did you find this article interesting?

Your rating is more than welcome or share this article via Social media!

Average rating 4.3 / 5. Vote count: 4

No votes so far! Be the first to rate this post.

We are sorry that this post was not useful for you!

Let us improve this post!

Tell us how we can improve this post?

Patty Mulder

Patty Mulder

Patty Mulder is an Dutch expert on Management Skills, Personal Effectiveness and Business Communication. She is also a Content writer, Business Coach and Company Trainer and lives in the Netherlands (Europe). Note: all her articles are written in Dutch and we translated her articles to English!

Related ARTICLES

Project Budget - Toolshero

Project budget explained: theory and a template

business requirements analysis toolshero

Business Requirements Analysis Framework and Steps

stakeholder management toolshero

Stakeholder Management: Theory and Strategy

Milestone Trend Analysis (MTA) - toolshero

Milestone Trend Analysis (MTA)

Request for proposal rfp - Toolshero

Request for Proposal (RFP)

Request for Information (RFI) - Toolshero

Request for Information (RFI)

Also interesting.

action plan toolshero

Action Plan explained plus template

Business Model You - Toolshero

Business Model You by Timothy Clark: a Summary

Failure Mode and Effects Analysis - Toolshero

Failure Mode and Effects Analysis (FMEA)

Leave a reply cancel reply.

You must be logged in to post a comment.

BOOST YOUR SKILLS

Toolshero supports people worldwide ( 10+ million visitors from 100+ countries ) to empower themselves through an easily accessible and high-quality learning platform for personal and professional development.

By making access to scientific knowledge simple and affordable, self-development becomes attainable for everyone, including you! Join our learning platform and boost your skills with Toolshero.

responsibility assignment matrix (ram)

POPULAR TOPICS

  • Change Management
  • Marketing Theories
  • Problem Solving Theories
  • Psychology Theories

ABOUT TOOLSHERO

  • Free Toolshero e-book
  • Memberships & Pricing

A Comprehensive Project Management Guide for Everything RACI

By Kate Eby | July 15, 2016 (updated September 5, 2023)

  • Share on Facebook
  • Share on LinkedIn

Link copied

To ensure collaboration and project success, it is crucial for all project stakeholders to understand their roles and responsibilities and those of other project members. This is especially important when project teams are more complex due to their large size, involvement of distributed team members, or reliance on staff from multiple departments. 

RACI stands for Responsible Accountable Consulted Informed. While its origins are murky, the RACI matrix has been adopted by many organizations to associate roles with project deliverables. One Six Sigma tutorial describes RACI this way:

“Typically a task is associated with at least one role or in some cases multiple roles. This ‘Association’ of the role with a task can be divided into the following four association types:

  • R esponsible
  • A ccountable

The above four types of association of a role to a task represented in a simple task vs. role diagram or matrix is called RACI (pronounced ‘racey’) matrix. So basically the RACI matrix is a responsibility assignment matrix (RAM), designed to assign tasks, activities, responsibilities, accountability, decision making, support to team members of a process/project, and clarify expectations on the level of their participation.” Here is an example of a RACI matrix:

responsibility assignment matrix (ram)

This guide will explain when to use RACI, why it works, guidelines to use it effectively, and the role it can play in effective project management in all industries from construction to healthcare. Lastly, we'll show you that once you've created your own matrix, you'll need a collaborative, real-time tool, like Smartsheet, to manage the rest of the project details — from start to finish.

The Four Association Types

RACI has four association types: responsible, accountable, consulted, and informed. Responsible roles produce deliverables; accountable roles check the deliverables; consulted roles advise on tasks; and informed roles are kept informed throughout these processes.

  • Responsible: These roles are responsible for completing the task or deliverable. For example, if the responsibility role is a technical writer, this person may be responsible for writing online help files. A software developer wouldn’t write the help files, but might incorporate those files into the product, which would be defined as a different task.
  • Accountable: This type of role has the final authority on (or is accountable for) the task’s completion. To take the previous example of a technical writer developing online help and a software developer incorporating the help files, a product manager might be responsible for ensuring that the files make it into the product.
  • Consulted: This role functions as an adviser to a task. For example, a team may consult with a Scrum Master as a subject matter expert (SME). Consider advisers carefully, as having too many people in this role can stretch the task time and raise the risk of poor performance.
  • Informed: Informed team members are kept up to date on task completion. Charting this role helps to illustrate dependencies among tasks and also ensures transparency into task status. It can be difficult to identify those who need to be informed, so consult various roles to determine who needs status updates. For example, the sales manager may require status updates because a customer has a special interest in feature development.

When to Use RACI

A RACI model is a useful tool for general project management. Use a RACI matrix when processes are stalled due to role confusion, or when role authority is not clearly outlined. We’ve outlined some common use cases for RACI below:  

  • If the approval process is bogged down, it may be due to role confusion.
  • If decisions are being overruled often and seemingly arbitrarily, this is also a situation that can benefit from clarifying roles.
  • Another situation that frequently occurs is that many people perform the same analysis tasks. When tasks are not getting done, it may be that nobody knows who should be doing them.
  • When the authority to perform tasks is not understood, it may be time to define roles and tasks, responsibilities, and authority.

Eliminating this sort of confusion and clarifying roles and tasks is the chief function of a RACI Matrix.

RACI is among the most popular models, but there are several alternatives, including:

  • PACSI – Used in situations where multiple stakeholders can review and veto the work of a single accountable person. The roles include Performed, Accountable, Control, Suggested, and Informed.
  • RAPID – Created by Bain & Company to clarify decision accountability through clear role and responsibility delineation. The roles include Recommend, Agree, Perform, Input, and Decide.

The Value of RACI

Implementing a RACI model helps you to involve the most qualified people in your projects. Project managers can use RACI to quickly develop charts that provide clarity to the team. Some major benefits of the RACI model are as follows:

  • Eliminating role confusion.
  • Preventing over-allocation of resources to one project and under-allocation to another.
  • Clearly defining roles to all the people who fill them (clear understanding of expectations is key to a smooth project and reduces the need for conflict resolution later).
  • Ensuring no task is overlooked when resources are allocated.
  • Providing a fast and efficient way to re-allocate resources when there is turnover. New people can quickly identify their roles in a project and the roles of those with whom they must interact.

Finally, because the Informed category is given equal weight, the RACI Matrix encourages communication between roles. Communication is the key to clearly understanding expectations, which results in a smooth project.

RACI Matrices

A RACI matrix is a collection of all project activities associated with the people or roles responsible for each. Your matrix should include all project elements, including planning, testing, design, and support.

To create a RACI matrix, consider the following steps: 

  • Decide How to Chart the Matrix: You can use any number of tools or templates, including a spreadsheet, whiteboard, or software solution.
  • Identify the Project Tasks or Deliverables: Meet with key stakeholders to develop a list of project tasks. For this discussion, tasks include necessary activities, like meetings or events, as well as tangible deliverables, like features or products. Plot tasks across the X or Y axis of the matrix. For example, if you are charting a software project developed under Agile, the sprint demo meeting may be a required activity and should be included in the matrix as a task. Don’t forget to add maintenance of the RACI Matrix as its own task. The project manager usually maintains the RACI Matrix.
  • Identify the Project Roles: Project roles are labeled across the other axis of the matrix. The project roles make the matrix more understandable and can be useful for adding any data you may have forgotten. As you identify roles, add any tasks that apply to those roles on the task axis. The task axis is also useful for identifying roles and clarifying resource allocation. This is a good time to assign names to roles as well — one name per role is optimal.
  • Label the Intersections of the Axes: Where the X and Y axes intersect, label the intersection with an R, A, C , or I to finalize the matrix with who should be responsible, accountable, consulted, or informed on each task.

RACI Guidelines

While RACI matrices will differ by project, there are some broad guidelines that you should always follow. Above all, your matrix should encourage teamwork and inform all people of their roles and assignments. We’ve laid out additional best practices below: 

  • Avoid multiple levels of oversight – one level is enough 
  • Encourage teamwork
  • Maintain chart fluidity – make changes as needed and let people know when things change
  • Assign only one Accountable per task
  • Ensure Accountable assignees have authority to ensure the task is complete
  • Avoid too many consultants as they can take up too much time (waiting for answers, gathering input, etc.) while too few can damage performance, so try to find the "sweet spot”  
  • Inform everyone with a role of their assignment

Finding the Right RACI Template

RACI templates save time and provide a starting point for building your chart. Choose a simple, customizable template to ensure that it is as useful as possible for all team and project types.

Some templates use the X axis for the tasks and Y for roles, and others do the opposite. If tasks exceed roles, as they generally do, it is easier to use the X axis for tasks and the Y for roles as you will be able to see the greatest number of roles per task at a glance on most computer monitors. On the other hand, you may find it easier to filter a chart based on role (for instance, filtering to show only the “I” roles for a given task) with the tasks on the X axis. In addition, most templates use some form of color-coding.

Regardless of which template you select, using one will eliminate a lot of basic work in constructing the chart and will free your time to define roles and tasks.

RACI Project Management

RACI project management focuses on creating and managing a RACI matrix to identify and resolve conflicts in roles and revise role categorization. You should approach analysis as a team and encourage all roles to provide feedback.

A RACI Matrix is analyzed vertically and horizontally. Here are some things to look for when reviewing the role axis (whether this is horizontal or vertical):

  • If one role has too many responsibilities, should some responsibilities be reallocated or should more people be assigned to the role?
  • If only one person is Accountable, is it reasonable to expect that person to make all decisions and could it threaten the project by creating a bottleneck?
  • Here are some things to look for when reviewing the Task axis (whether this is horizontal or vertical):
  • If there is a task with no one Responsible, should someone be assigned or should the task be eliminated?
  • If there is a task where no one is Accountable, who has decision-making authority?
  • If there are multiple people Accountable for a task, avoid conflicts by making a single person accountable. 
  • If too many people must be consulted, evaluate whether one person can be assigned who talks with others involved.

It is common, during the life of a project, to have team members experience role confusion. A RACI matrix is useful for clearly identifying roles associated with a project and improving productivity, especially when you’re suffering from role confusion. Some signs of role confusion are:

  • Concern over who makes decisions —Decision-makers are usually labeled as Accountable, but it may be that decisions are being made by the Responsible party. If that’s the case, the team should know who makes decisions in each situation.
  • Finger pointing —If work is not completed on time, finger pointing may result. The key to avoiding this is knowing who is Responsible. 
  • Poor resource allocation —The RACI Matrix should make resource allocation very clear, but sometimes a single task can be extremely taxing, leading to some issues concerning who should be doing what and when.
  • Lack of action because of ineffective communications —If someone is not Informed, they may not know to perform a task.
  • Too many consultations because the wrong people are consulted —The Consulted should be clearly labeled to avoid jeopardizing the project schedule.

It is the duty of a project manager to step in if role confusion is suspected and clarify roles to ensure that everyone is aware of expectations.

Smartsheet for Project Management

Smartsheet is a spreadsheet-inspired project management platform with powerful collaboration and communication features. By providing a broad range of views including Gantt, calendar, grid, and dashboards, you can manage projects the way you want. Track project requirements, store documents, create timelines, and organize key details.

project rollup sheet dashboard

Watch the Demo

Looking for more

Spreadsheet icon with blue background

Free 30-day trial

Enable everyone to work better, at scale, with Smartsheet.

Get started for free

2 by 3 table of spreadsheet template examples, multicolored

Download free templates

Test drive Smartsheet, the Enterprise Work Management Platform.

Get free templates

Recommended Articles

Smartsheet Future of Work Management Report 2023 - Open Graphic

Future of Work Management Report 2023

project management smartsheet devices

Project Management Guide

A pink folder with a settings gear icon on it with plans inside

Free Project Management Plan Templates

Discover a more collaborative way to manage projects..

responsibility assignment matrix (ram)

  • Onsite training

3,000,000+ delegates

15,000+ clients

1,000+ locations

  • KnowledgePass
  • Log a ticket

01344203999 Available 24/7

Responsibility Assignment Matrix: A Complete Overview

Dive into the world of Responsibility Assignment Matrix (RAMs), which helps assign roles and responsibilities and how they streamline Project Management. This comprehensive blog explains their purpose, benefits, and practical use, enabling effective role definition and accountability in project teams. Continue reading!

stars

Exclusive 40% OFF

Training Outcomes Within Your Budget!

We ensure quality, budget-alignment, and timely delivery by our expert instructors.

Share this Resource

  • Project and Infrastructure Financing Training
  • Waterfall Project Management Certification Course
  • Jira Training
  • CGPM (Certified Global Project Manager) Course
  • Project Management Office Fundamentals Certification Course

course

This comprehensive blog aims to provide you with a complete overview of the Responsibility Assignment Matrix and its pivotal role in Project Management and organisational structure. 

Table of Content 

1) What is a Responsibility Assignment Matrix in Project Management? 

2)  Responsibility Assignment Matrix (RAM) goal in Project Management 

3) How to create a Responsibility Assignment Matrix? 

4) Benefits of Responsibility Assignment Matrix 

5) Developing Responsibility Assignment Matrix (RAM) best practices 

6) Conclusion  

What is a Responsibility Assignment Matrix in Project Management? 

A Responsibility Assignment Matrix (RAM) in project management is a tool that outlines and defines the roles and responsibilities of individuals or groups involved in a project. Its purpose is to ensure that everyone understands their specific duties and tasks. The primary purpose of a RAM is to bring clarity to the project structure, helping to prevent confusion, overlap, and accountability issues throughout the project lifecycle.

RAM in Project Management is also known as Responsible, Accountable, Consulted and Informed (RACI). RACI represents different levels of roles and responsibilities for individuals or teams:

a) Responsible: The individual or group in responsible for finishing a certain job or project. They are the ones who perform the work.

b) Accountable: The individuals who have complete responsibility and decision-making authority over the job or result. They ensure that the task is completed and of satisfactory quality.

c) Consulted: Individuals or stakeholders are consulted for their views or skills before to making a decision or taking actions. They contribute essential insights but may not be directly responsible for the task.

d) Informed: Individuals or stakeholders who need regular updates on the task’s progress or result. They are not actively involved in its conclusion, but they must be notified of any advancements.  

Project Management Courses | Training & Certifications

Responsibility Assignment Matrix goal in Project Management 

The primary goal of a Responsibility Assignment Matrix in Project Management is to clearly define and communicate the roles and responsibilities of individuals or teams involved in a project. Here are the key goals of using a RAM in Project Management: 

a) Clear roles and responsibilities: The RAM establishes clear roles and responsibilities for each team member, minimising confusion and conflicts.

b) Enhanced communication: Documenting roles and responsibilities concisely in the RAM facilitates effective communication within the project team. Also, enabling quick identification of contacts for specific issues or inquires.

c) Conflict resolution: BY operating a reference point, the RAM helps to resolve conflicts or misunderstandings about responsibilities, providing a foundation for conversation and conflict resolution.

d) Improved project control: With the RAM in place, Project Managers and stakeholders can more easily monitor project progress, identifying task accountability and monitoring work package status.

e) Efficiency and accountability: By allocating responsibility to each project aspect, the RAM promotes accountability among team members, resulting in increased efficiency as everyone understands their duties and expectations.

f) Risk Management: The clear roles of RAM help detect potential hazards associated with functional gaps or overlaps, enabling proactive risk mitigation strategies.  

g) Optimal Resource Allocation: Project managers can optimise resource allocation by understanding task ownership and workload distribution as described in the RAM.

Ready to lead digital service projects to success? Register for our Certified Digital Services Project Manager (CDSPM) Course today!   

How to create a Responsibility Assignment Matrix? 

How to Create a Responsibility Assignment Matrix

Identify the project scope 

Start by recognising the project's scope or the exact purpose for which you are building RAM. This includes establishing project objectives, outcomes, and critical milestones.

Define roles and responsibilities 

a) Identify the key roles involved in the project. Common roles may include Project Manager, Team Leader, Team Member, Stakeholders, and other relevant positions. 

b) Clearly define the responsibilities associated with each role. These responsibilities should be specific and measurable so there is no ambiguity. 

Choose a framework - RACI, RASCI, or DACI 

a) Select a framework for your RAM. The most commonly used frameworks are RACI, RASCI, and DACI: 

b) RACI: RACI   Stands for Responsible, Accountable, Consulted, and Informed. It defines who is responsible for a task, who is accountable for its completion, who needs to be consulted, and who needs to be informed. 

c) RASCI: RASCI Similar to RACI, but with an additional role, the "S" for Support. This framework further clarifies who provides support for a task. 

d) DACI: This framework is similar to RASCI but adds the role of Driver. The Driver is responsible for ensuring that a task is completed. 

Assign roles using the framework 

a) For each task or work package within the project, assign the relevant roles using the chosen framework. Each task should have a Responsible person, an Accountable person, and, if necessary, people who need to be Consulted, Informed, or Supported. 

b) Be specific and ensure that there is only one person designated as "Accountable" for each task to avoid confusion. 

Document the RAM 

a) Create a table or chart that lists all the tasks or work packages on one axis and the identified roles on the other. 

b) Fill in the matrix with the appropriate role designations (R, A, C, I, S, D) for each task and role. 

Review and validate 

Share the RAM with the project team and stakeholders for evaluation and approval. Confirm that everyone agrees on the roles and responsibilities.

Implement and communicate 

Once the RAM has been completed and approved, communicate it to the project team and other stakeholders. Ensure that everyone understands their jobs and responsibilities. 

Regularly update the RAM 

As the project evolves, it is critical to improve the RAM as necessary. Roles and duties might shift, and new tasks may develop. Keep the RAM current to reflect the project's evolving needs.

Unlock your potential as a Program Manager with our Programme Management (PgM) Fundamentals Course !  

Benefits of Responsibility Assignment Matrix

Benefits of Responsibility Assignment Matrix

a) Clarify roles and responsibilities: A RAM clearly defines who is responsible for each task, which helps prevent confusion and ensures that team members understand their roles.

b) Improved communication: The RAM serves as a central reference point for roles and responsibilities, promoting effective communication within the project team. Team members can quickly identify who to contact for specific issues or questions.

c) Conflict resolution: When there is a dispute or ambiguity regarding responsibilities, the RAM provides a basis for discussion and conflict resolution. It helps identify where accountability lies and facilitates problem-solving.

d) Enhanced project control: The RAM allows Project Managers and stakeholders to monitor and manage the project's development.  It helps you to track the status of assignments and ensure that tasks are getting done as planned.

e) Efficiency and accountability: Clearly defined roles and responsibilities create a sense of responsibility among team members, maybe resulting in improved productivity. When people understand what is required of them, and they are more likely to fulfil it.

f) Resource allocation: The RAM helps Project Managers optimise resource allocation by understanding who is responsible for specific tasks. This ensures that workloads are distributed evenly and that resources are used efficiently. 

Developing Responsibility Assignment Matrix (RAM) best practices 

Developing a Responsibility Assignment Matrix (RAM) is a critical aspect of project management. To create an effective RAM, consider the following best practices: 

a) Involve key stakeholders: Define roles and responsibilities after consulting with project stakeholders, team members, and subject matter experts. Their participation can provide useful information about the project's objectives. 

b) Keep it simple: Use a simple framework (e.g., RACI, RASCI, or DACI) that team members are able to quickly understand and use.

c) Use clear and specific language: In order to prevent confusion, write tasks clearly and precisely. Avoid using confusing or unclear terms that may lead to confusion.

d) Designate a single "accountable" person: Assign only one person as "Accountable" for each task. This individual is ultimately responsible for the task's completion. Multiple accountable persons can lead to confusion and accountability issues. 

e) Consult and inform appropriately:   It is important to carefully consider the individuals who need to be consulted and informed for each task. Avoid unnecessary involvement, which can lead to inefficiency. Ensure that the right people are included in these roles. 

f) Review and validate with the team: Share the RAM with the project team and stakeholders for feedback and validation. Ensure that all parties agree with the assigned roles and responsibilities. 

g) Document assumptions and clarifications: If certain roles and responsibilities are based on assumptions or require clarification, document these notes alongside the RAM. This can help avoid misunderstandings in the future. 

Join our Project Management Masterclass today and take the leap towards becoming a project management expert!

Conclusion  

A Responsibility Assignment Matrix is an important tool in Project Management and organisational systems. Its importance comes from its capacity to define, assign, and explain the roles and responsibilities, resulting in improved project effectiveness and performance.

Take the next step in your project management career with our Certified Global Project Manager (CGPM) Course !  

Frequently Asked Questions

Creating a Responsibility Matrix is appropriate for the project's initiation stage. It outlines roles, duties, and communication channels to promote responsibility throughout the project's lifecycle. 

The Responsibility Assignment Matrix or RACI model divides tasks as Responsible, Accountable, Consulted, or Informed. It promotes transparency and accountability among the project group.

The Knowledge Academy takes global learning to new heights, offering over 30,000 online courses across 490+ locations in 220 countries. This expansive reach ensures accessibility and convenience for learners worldwide. 

Alongside our diverse Online Course Catalogue, encompassing 17 major categories, we go the extra mile by providing a plethora of free educational Online Resources like News updates, Blogs , videos, webinars, and interview questions. Tailoring learning experiences further, professionals can maximise value with customisable Course Bundles of TKA .  

The Knowledge Academy’s Knowledge Pass , a prepaid voucher, adds another layer of flexibility, allowing course bookings over a 12-month period. Join us on a journey where education knows no bounds.

The Knowledge Academy offers various Project Management Courses , including Introduction to Project Management Certification Course, Certified Digital Services Project Manager and Project Management Course. These courses cater to different skill levels, providing comprehensive insights into Types of Project Managers .

Our Project Management Blogs cover a range of topics related to Project Management, offering valuable resources, best practices, and industry insights. Whether you are a beginner or looking to advance your Project Management skills, The Knowledge Academy's diverse courses and informative blogs have you covered.  

Upcoming Project Management Resources Batches & Dates

Fri 17th May 2024

Fri 21st Jun 2024

Fri 19th Jul 2024

Fri 16th Aug 2024

Fri 13th Sep 2024

Fri 11th Oct 2024

Fri 8th Nov 2024

Fri 13th Dec 2024

Get A Quote

WHO WILL BE FUNDING THE COURSE?

My employer

By submitting your details you agree to be contacted in order to respond to your enquiry

  • Business Analysis
  • Lean Six Sigma Certification

Share this course

Our biggest spring sale.

red-star

We cannot process your enquiry without contacting you, please tick to confirm your consent to us for contacting you about your enquiry.

By submitting your details you agree to be contacted in order to respond to your enquiry.

We may not have the course you’re looking for. If you enquire or give us a call on 01344203999 and speak to our training experts, we may still be able to help with your training requirements.

Or select from our popular topics

  • ITIL® Certification
  • Scrum Certification
  • Change Management Certification
  • Business Analysis Courses
  • Microsoft Azure Certification
  • Microsoft Excel Courses
  • Microsoft Project
  • Explore more courses

Press esc to close

Fill out your  contact details  below and our training experts will be in touch.

Fill out your   contact details   below

Thank you for your enquiry!

One of our training experts will be in touch shortly to go over your training requirements.

Back to Course Information

Fill out your contact details below so we can get in touch with you regarding your training requirements.

* WHO WILL BE FUNDING THE COURSE?

Preferred Contact Method

No preference

Back to course information

Fill out your  training details  below

Fill out your training details below so we have a better idea of what your training requirements are.

HOW MANY DELEGATES NEED TRAINING?

HOW DO YOU WANT THE COURSE DELIVERED?

Online Instructor-led

Online Self-paced

WHEN WOULD YOU LIKE TO TAKE THIS COURSE?

Next 2 - 4 months

WHAT IS YOUR REASON FOR ENQUIRING?

Looking for some information

Looking for a discount

I want to book but have questions

One of our training experts will be in touch shortly to go overy your training requirements.

Your privacy & cookies!

Like many websites we use cookies. We care about your data and experience, so to give you the best possible experience using our site, we store a very limited amount of your data. Continuing to use this site or clicking “Accept & close” means that you agree to our use of cookies. Learn more about our privacy policy and cookie policy cookie policy .

We use cookies that are essential for our site to work. Please visit our cookie policy for more information. To accept all cookies click 'Accept & close'.

PM Study Circle

What is a Responsibility Assignment Matrix (RAM) in Project Management?

Fahad Usmani, PMP

March 30, 2024

A responsibility assignment matrix (RAM) in project management is a key document that distinguishes stakeholders’ roles and responsibilities. The RACI chart is the most popular example of a RAM that clarifies stakeholders’ roles and defines their involvement.

RACI stands for Responsible, Accountable, Consulted, and Informed. Each team member in the RACI chart has at least one role.

All stakeholders refer to RAM in case of conflict regarding the roles and responsibilities in assignments or duties. RAM helps reduce conflict in projects to a great extent. Using this document, every team member will know their roles and the responsibilities of other team members.

The roles in the RACI matrix are as follows:

  • Responsible: This stakeholder is responsible for completing the task.
  • Accountable: This stakeholder is accountable for the task. They will make decisions and delegate work to the stakeholders who are responsible for completing the task.
  • Consulted: These stakeholders will be consulted on any decisions made about the task.
  • Informed: These stakeholders only require an updated status report on the progress of the task.

Responsibility Assignment Matrix Example

As I said, the RACI chart is the most popular example of RAM.

The table below shows the RAM example using the RACI chart:

Example of Responsibility Assignment Matrix

Some other less-popular responsibility assignment matrix examples are as follows:

  • RASCI Chart: This chart is also known as the “RASCI matrix,” as the letter S is added, which means “supportive.” 
  • DACI Chart: DACI stands for “Driver, Approver, Contributor, and Informed.” 
  • RAPID Chart: RAPID stands for “Recommend, Agree, Perform, Input, and Decide.” 
  • CARS: CARS stands for “Communicate, Approval, Responsible, and Support.” 
  • CLAM: CLAM stands for “Contribute, Lead, Approve, and Monitor.” 

Responsibility Assignment Matrix Template

The table below shows the basic template for the responsibility assignment matrix.

Responsibility Assignment Matrix Template

RAM is a key tool in project management . It helps the project manager assign roles and responsibilities. Additionally, it ensures that the team stays on its path and that no one interferes with each other’s roles. Finally, RAM ensures that every task has responsible and accountable stakeholders assigned to it.

This topic is important from a PMP exam point of view.

responsibility assignment matrix (ram)

I am Mohammad Fahad Usmani, B.E. PMP, PMI-RMP. I have been blogging on project management topics since 2011. To date, thousands of professionals have passed the PMP exam using my resources.

PMP Question Bank

This is the most popular Question Bank for the PMP Exam. To date, it has helped over 10,000 PMP aspirants prepare for the exam. 

PMP Training Program

This is a PMI-approved 35 contact hours training program and it is based on the latest exam content outline applicable in 2024.

Similar Posts

What is Project Portfolio Management (PPM) in Project Management?

What is Project Portfolio Management (PPM) in Project Management?

Project Portfolio Management (PPM) is the management of different projects, programs, or programs and projects under one umbrella. This umbrella is called a “portfolio.” Portfolio management in project management selects different projects, programs, or any combination of the two to efficiently manage resources and assign project and program managers. Portfolio management supports the PMO (project…

Forming, Storming, Norming, and Performing: Tuckman Model

Forming, Storming, Norming, and Performing: Tuckman Model

In 1965, an American psychologist, Bruce Wayne Tuckman, published the paper “Developmental Sequence in Small Groups,” describing four stages of team development: forming, storming, norming, and performing. Later adding, the fifth stage, “adjourning,” is also known as mourning.  This theory is referred to as “Tuckman’s stages of group development,” and it explains the path a…

PMP Braindump: a Sure-fail Strategy for PMP Certification Exam Preparation

PMP Braindump: a Sure-fail Strategy for PMP Certification Exam Preparation

Since you are studying and preparing for the PMP certification exam, you might be aware of the term braindump, because a lot of websites will be offering you theirs to pass the PMP exam, with a 100% guarantee.

You may have a few questions about these braindumps, like: What is a braindump?, Are they beneficial for my studies?, Should I use them for my exam preparation?

So, to answer all these questions, I’m writing this blog post, and I hope that after going through it, all your questions will be answered.

Goal Vs Objective

Goal Vs Objective

Many professionals use the terms “goal” and “objective” interchangeably. I used to do the same—even though they define different outcomes that an organization intends to achieve. Goals and objectives differ in terms of specifics, timelines, measurement, the level of detail required, and their impact on your organization.  Goals and objectives both are vital for business…

Close CRM Review (2024): Pricing, Pros & Cons & Features

Close CRM Review (2024): Pricing, Pros & Cons & Features

Today, I will provide my detailed Close CRM review, pricing, pros, cons, and top features in this blog post. After reading this review post, I hope you will have a clear idea if this is the right CRM platform for your business. Customer Relationship Management (CRM) tools are essential for organizations to help keep their…

Cynefin Framework: Leaders Framework for Decision Making

Cynefin Framework: Leaders Framework for Decision Making

Leaders face many challenges and complexities in today’s dynamic and interconnected era. Understanding, categorizing, and addressing intricate issues has become fundamental for organizations that seek to thrive in uncertainty. The Cynefin Framework emerges as an indispensable tool, empowering leaders or managers to embrace complexity and find clarity in ambiguity. What is the Cynefin Framework? The…

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

web analytics

Organizational Structure

What is a Responsibility Assignment Matrix

Last updated: Feb 15, 2023

Table of contents

What is a RAM matrix used for?

How to make a ram or raci chart.

Learn what a Responsibility Assignment Matrix is and how to use one to make all your upcoming projects run smoothly.

Credit: track5/Getty Images

A Responsibility Assignment Matrix (RAM), sometimes known as a RACI chart, is a tool used in project management to keep track of all responsibilities assigned to cross-functional teams on a specific task or assignment.

It’s known as a RACI chart because its acronym names the four key roles displayed in the matrix:

  • Responsible: Who is the person responsible for completing a task or making a decision?
  • Accountable: Who is accountable for the completion of the project overall and will sign off on deliverables and decisions?
  • Consulted: Who needs to be consulted to provide input on a particular task or item?
  • Informed: Who needs to be kept informed of project progress or completion?

A typical RAM template looks like this:

| Task | Annabelle (PM) | Jack (Technical Lead) | Dory (Technical Team Member) | | ---------- | ---------- | ---------- | ---------- | | Task 1 | A | I | R | | Task 2 | R | C | I | | Task 3 | C | R | C | | Task 4 | A | R/I | R |

The RAM matrix is used to document every task, item and decision involved in a project completion process. By keeping everything logged all in one place, a RAM matrix is an invaluable tool to any project manager or company leader for a few reasons.

  • Defines clear roles and responsibilities

There is nothing worse than a project being slowed down or stalled because of confusion over who was supposed to do what. In a RAM, every person or team involved can check to see which task or item.

  • Streamlines communication

Sometimes explaining directions in person or over a workplace communication tool can get confusing or be interpreted the wrong way. Even worse, one instance of miscommunication can tank an entire project or jeopardize a relationship with a client.

With a RAM, project managers don’t have to waste time directing questions to the responsible stakeholder in charge of making a decision. The chart informs everyone involved exactly who they can go to for answers, cutting out repetitive conversations and notifying the right people at the right time.

  • Distributes workloads evenly

No one ever wants to be the one in the group project that has to do everything. Team members with a higher workload are at a greater risk for burnout. A great benefit of a RAM is that everyone can see how the workload for a certain project is distributed. It’s also a great way to be transparent within workflows.

Don’t let the random letters confuse you. Building a RACI chart is surprisingly simple. It can also easily be tweaked to fit your organization and your particular project. According to the work management platform Wrike , here are four steps to follow when building a responsibility assignment matrix:

  • Identify all project roles

Start out with a list of everyone involved in a project, including every team, team member, manager and stakeholder.

  • Identify all project tasks

Then make a list of all the tasks and items needed to get a project done. These can include deliverables, activities, milestones and decisions.

  • Create a chart with a column for each role and a row for each task

In a spreadsheet—or any other tool you’d like—create a simple table by listing each person or role in the columns and each task or deliverable in the rows.

To get the most out of your RACI chart, try to make the roles as personal as possible. For example, instead of naming a role “technical lead,” try to use names, like “Jack.” This will give every person involved a sense of ownership, while also streamlining communication even further.

  • Assign “R,” “A,” “C” or “I” to each person involved

Once you have written out the names of each person and task, now comes the important part of assigning RACI to each person involved. Identify who is responsible, who is accountable, who needs to be consulted and who needs to be informed for every task in the project. A role can have more than one letter, but simplify it as much as you can. Bonus step: Add a color to each letter to make the roles stand out even more.

That’s it! You now have made a successful RACI chart. Review with your team and all stakeholders before you initiate a plan, and you are officially on your way to more effective project management.

Create your own free org chart today!

Show off your great team with a public org chart. Build a culture of recognition, get more exposure, attract new customers, and highlight existing talent to attract more great talent. Click here to get started for free today.

responsibility assignment matrix (ram)

The ORG helps you hire great candidates

Free to use – try today

Which Org Structure Fits You?

Matrix organizational structure, flat organizational structure, functional organizational structure.

For enquiries call:

+1-469-442-0620

banner-in1

  • Project Management

Responsibility Assignment Matrix: Template, Example & Benefits

Home Blog Project Management Responsibility Assignment Matrix: Template, Example & Benefits

Play icon

Your team is the most crucial resource in completing a job. They must adhere to the project's schedule and budget. Controlling the project requires everyone involved to understand their roles and duties when carrying out tasks and accomplishing project objectives. How can all the participants in a project be coordinated so that they are aware of what they are doing and do not prevent others from carrying out their tasks? An assignment of responsibility matrix can be useful.

Your project will have a productive crew thanks to an assignment matrix. You can take an online PMP course to learn the details included in RAM, Responsibility Assignment Matrix in project management, and Responsibility Assignment Matrix example, to advance your career.

What is a Responsibility Assignment Matrix in Project Management?

So, what is the responsibility assignment matrix?  A Responsibility Assignment Matrix (RAM), sometimes referred to as a RACI chart or RACI matrix, in project management identifies all relevant stakeholders and specifies roles for cross-functional teams and their level of involvement in a project. Each letter in the acronym RACI, which stands for Responsible, Accountable, Consulted, and Informed, refers to a different team member in the Responsibility Assignment Matrix in Project Management.

1. Responsible

The team member that oversees finishing the assignment is the person responsible for the RAM, Responsibility Assignment Matrix. The person in charge may be tasked with gathering all the visual and data assets required to put together the presentation if your team is working on a pitch deck (Responsible for executing the task).

2. Accountable

The responsible team member distributes the tasks to the other team members and ensures that they are finished accurately and on time. This team member oversees making sure the project is completed on schedule and that the tasks are fairly distributed among the accountable parties (Has governing & directing authority).

3. Consulted

A responsible party in Responsibility Assignment Matrix Project Management may frequently need to consult an expert, who serves as the consulted person, to finish certain responsibilities. A professional analysis of the consulted party is required when someone is tasked with gathering marketing statistics for a presentation. They also need to ensure that the data the responsible party is required to submit is accurate (Provide insights, analysis or expert judgment).

4. Informed

The informed party needs to be aware of when the major project components are finished even though they may not be directly involved in all the steps to ensure that everything is running smoothly. The informed team member must be aware of any delays or stalls in the project as they must complete their tasks (Updated with project information and outcome).

Responsibility Assignment Matrix in Project Management

Responsibility Assignment Matrix (RAM) Goal in Project Management

The goal of the Responsibility Assignment Matrix (RAM) is to clearly define roles and responsibilities of everyone on a project team. This ensures that everyone understands their role and how it fits into the bigger picture. RAM also allows for quick identification of whom to contact when an issue arises. It might also be applied within a working group to establish authority levels, roles, and duties for tasks.

The matrix format displays each person's associated actions and each person's associated people. To avoid confusion, this makes sure that there is only one person responsible for each task. It is also important to outline the dates and reminders for each participant, so that they are aware of their deliverables/plans to fulfill the deliverables. The best Project Management Certification programs online will teach you how to make efficient decisions and effectively use RAM.

How to Create a Responsibility Assignment Matrix?

A Responsibility Assignment Matrix (RAM) is a table that shows the tasks needed to be completed as part of a project, who is responsible for each task, and when the task needs to be completed. Making a matrix to distribute responsibilities is not as challenging as getting everyone on board with their respective jobs and responsibilities.

You should therefore involve your staff in the process, receive their feedback, and eventually secure their buy-in without expending excessive time and effort on it. You will have a successful responsibility assignment if you follow these instructions to ensure that everyone is on the same page. 

  • List every person involved in the project, including the team, stakeholders, and everyone in between.
  •  List each project deliverable that you can think of. To make sure you do not overlook any, use a work breakdown framework.  
  •  To discuss how to carry out the tasks and produce the deliverables, meet with the team members. The duty and authority of the team for each assignment must be discussed.
  •  Utilizing a table with the project tasks specified in the left-hand column, create a Responsibility Assignment Matrix. Print the names of everyone involved in the project across the top.
  • Assign whether a project team member is liable, accountable, consulted, or informed where the tasks meet them.  
  •  Share the completed Responsibility Assignment Matrix Template Word with the project team and stakeholders. If necessary, conduct a meeting to ensure that everyone is aware of their responsibilities for the project. Print a copy, and if you are working in a common location, post it.

Developing Responsibility Assignment Matrix (RAM) Best Practices

The best practices for developing a Responsibility Assignment Matrix (RAM) will vary depending on the specific project and organization. However, some tips on how to develop a RAM matrix effectively include the following:

  • Define the project scope and objectives clearly, so that all stakeholders understand the parameters of the project and what is expected to be accomplished.
  • Assign clear roles and responsibilities to individuals and teams so that everyone knows who is responsible for what aspect of the project.
  • Make sure that the Responsibility Assignment Matrix PMP is kept up to date as the project progresses so that everyone is aware of any changes in roles and responsibilities.
  • Use the RAM matrix as a tool to help identify potential risks and issues related to the project so that they can be addressed early on.
  • One stakeholder leads a task.
  • The lesser number of people are accountable, the better.
  • Act efficiently with meetings.
  • Continuous communication.
  • Stakeholder agreement on final RAM.

Responsibility Assignment Matrix Examples and Templates

  • Responsibility Assignment Matrix (RACI) 
  • RACI-VS (Responsible, Accountable, Consulted, Informed- “V”erification and “S”ign off)
  • RASCI (Responsible, Accountable, Support, Consulted, Informed)
  • RAC (Responsible, Accountable, Consulted)
  • ARCI (Accountable, Responsible, Consulted, Informed)
  • RATSI (Responsibility, Authority, Task, Support, Informed)
  • PACSI (Perform, Accountable, Control, Suggest, Informed)
  • RACIQ (Responsible, Accountable, Consulted, Informed, Quality Review)
  • DACI (Driver, Approver, Contributors, Informed)
  • CAIRO (Consulted, Accountable, Informed, Responsible, Omitted)

sample responsible assignment matrix - RACI

Downloadable Responsibility Assignment Matrix Template Excel

Download the Responsibility Assignment Matrix Template (xlsx) here!

This Responsibility Assignment Matrix template is available for free in both Excel and OpenDocument Spreadsheet formats. The template can be completely modified using Microsoft Excel and adjusted to meet the needs of your project. To make it simple to understand what is required of each worker on each task, the template employs conditional formatting to change the color of each cell.

Download a Printable Responsibility Assignment Matrix PDF

Download the Responsibility Assignment Matrix Template (PDF) here!

If you intend to design a Responsibility Assignment Matrix (RAM), you may require samples and templates to use as a guide, regardless of whether you are managing an event, a construction project, or a restaurant. Some of the templates are-

  • Responsibility Assignment Matrix Sample
  • Responsibility Assignment Matrix for Construction Project Template
  • Basic Responsibility Assignment Matrix Sample
  • Responsibility Assignment Matrix in PDF

Benefits of Responsibility Assignment Matrix

There are many benefits of the Responsibility Assignment Matrix. One benefit is that it helps to ensure that everyone on a project team understands their roles and responsibilities. This can help to prevent misunderstandings and conflict between team members. Another benefit of using RAM is that it can help to improve communication between team members.

By clearly defining roles and responsibilities, team members will know whom to go to for specific information or tasks. This can help to avoid confusion and delays. Lastly, RAM can help to improve project management by providing a clear overview of who is responsible for what. This can help project managers to identify potential problems or areas where there may be a lack of resources.

Top Cities where Knowledgehut Conduct Project Management Certification Training Course Online

Unlock your potential as a Scrum Master with our game-changing certified scrum master course . Acquire the skills, knowledge, and confidence to effectively lead agile teams. Join us now and pave your way to success!

A Responsibility Assignment Matrix (RAM) is a tool used to identify and define the roles and responsibilities of individuals and groups within an organization. It is a means of clarifying who is responsible for what and ensuring that everyone understands their roles and responsibilities. RAM can be used to create accountability and ownership for tasks and projects, and to identify potential areas of conflict.

It is a valuable tool for effective project management and can help to ensure that everyone involved in a project is aware of their roles and responsibilities. It can also help to identify potential areas of conflict and ensure that tasks are properly assigned. The KnowledgeHut online PMP course will give you an insight into the Responsibility Assignment Matrix and can be a helpful tool for any project manager.

Frequently Asked Questions (FAQs)

1. what is included in a responsibility assignment matrix.

A Responsibility Assignment Matrix (RAM) is a tool used to help define and assign roles and responsibilities for a project or process. The matrix typically includes a list of tasks or deliverables and the people or groups responsible for each. 

2. What can a Responsibility Assignment Matrix (RAM) eliminate?

RAM eliminates ambiguity and confusion over who is responsible for what on a project. It also provides a clear overview of who is responsible for each task, making it easier to hold team members accountable.

3. What does a Responsibility Assignment Matrix not show?

The duty assignment matrix links resources to the tasks or work packages they must do, but it does not indicate when they will be required to do their work.

Profile

Kevin D.Davis

Kevin D. Davis is a seasoned and results-driven Program/Project Management Professional with a Master's Certificate in Advanced Project Management. With expertise in leading multi-million dollar projects, strategic planning, and sales operations, Kevin excels in maximizing solutions and building business cases. He possesses a deep understanding of methodologies such as PMBOK, Lean Six Sigma, and TQM to achieve business/technology alignment. With over 100 instructional training sessions and extensive experience as a PMP Exam Prep Instructor at KnowledgeHut, Kevin has a proven track record in project management training and consulting. His expertise has helped in driving successful project outcomes and fostering organizational growth.

Avail your free 1:1 mentorship session.

Something went wrong

Upcoming Project Management Batches & Dates

Course advisor icon

CIO Wiki

  • Recent changes
  • Random page
  • Help about MediaWiki
  • What links here
  • Related changes
  • Special pages
  • Printable version
  • Permanent link
  • Page information
  • View source

Responsibility Assignment Matrix (RAM)

A Responsibility Assignment Matrix (RAM) is a project management tool used to define and assign roles and responsibilities to team members in a project or an organization. It helps to clarify expectations, enhance communication, and ensure that all tasks are assigned to the appropriate individuals. RAM is particularly useful in large, complex projects where multiple stakeholders are involved.

Purpose: The purpose of a RAM is to provide a clear understanding of roles and responsibilities for each team member in a project. It aids in preventing confusion, miscommunication, and duplication of effort while ensuring that tasks and responsibilities are effectively allocated and managed.

Role: The RAM plays a significant role in project management by:

  • Defining roles and responsibilities: It helps to identify and outline the roles and responsibilities of each team member in relation to specific tasks or work packages.
  • Enhancing communication: By clearly defining responsibilities, RAM facilitates better communication between team members and stakeholders, ensuring everyone is on the same page.
  • Streamlining decision-making: The matrix simplifies decision-making by identifying the individuals responsible for making decisions related to specific tasks.
  • Monitoring and control: RAM serves as a valuable reference tool for project managers to track progress, identify bottlenecks, and ensure tasks are completed on time.

Components: A RAM typically includes the following components:

  • Work Breakdown Structure (WBS): A hierarchical decomposition of the project scope, breaking it down into smaller, manageable work packages or tasks.
  • Roles: The different roles involved in the project, such as project manager, team lead, subject matter expert, etc.
  • Responsibility indicators: Symbols or codes used to indicate the level of responsibility assigned to each role for a specific task. Common indicators include Responsible, Accountable, Consulted, and Informed (RACI).

Importance: A RAM is important for successful project management as it helps to:

  • Clearly define and communicate roles and responsibilities.
  • Improve collaboration and coordination among team members.
  • Streamline decision-making and problem-solving.
  • Enable more effective monitoring and control of project progress.
  • Enhanced clarity and communication of roles and responsibilities.
  • Reduced miscommunication, confusion, and conflict.
  • Improved efficiency and effectiveness in project execution.
  • Facilitates better resource allocation and workload management.
  • Provides a clear visual representation of roles and responsibilities.
  • Streamlines communication and decision-making.
  • Helps to ensure tasks are assigned and completed efficiently.
  • May become overly complex in large projects with numerous tasks and roles.
  • Requires regular updating and maintenance as project scope, tasks, or team members change.
  • May not be as useful in small projects or teams with well-defined roles and responsibilities.

Examples to illustrate key concepts: Imagine a software development project with multiple teams responsible for different aspects of the project, such as development, testing, and documentation. Creating a RAM for this project would involve breaking down the project scope into work packages or tasks and assigning roles and responsibilities for each task. The RAM would clarify who is responsible for coding a specific feature, who needs to review and approve the code, and who needs to be consulted or informed during the development process. This clarity helps to improve communication, collaboration, and overall project execution.

  • IT Strategy (Information Technology Strategy)
  • IT Governance
  • Enterprise Architecture
  • Chief Information Officer (CIO)
  • IT Sourcing (Information Technology Sourcing)
  • IT Operations (Information Technology Operations)

Popular Articles

  • Personnel Management
  • Architecture Development Method (ADM)
  • IT Operating Model
  • Strategic Intent
  • Data Governance
  • Business Capability
  • IT Strategic Plan (Information Technology Strategic Plan)
  • IT Ecosystem
  • Information Technology (IT)
  • International Accounting Standards Board (IASB)
  • Economic Value Added (EVA)
  • Strategic Business Unit
  • Business Process Architecture
  • Configuration Item (CI)
  • IT Operations Management (ITOM)
  • Organizational Goals
  • Business Process Engineering (BPE)

Proudly Serving the EVM Community for 40 Years.

  • Contact Us: 714-685-1730
  • EVMS Newsletter Sign Up
  • CAM Certification
  • EVMS Proposal Support
  • EVMS Requirements/Gap Analysis
  • EVMS System Design and Documentation
  • EVMS Implementation
  • EVMS and Project Management Training
  • Preparation for an Integrated Baseline Review
  • Preparation for an EVMS Compliance Review
  • EVMS Staff Augmentation
  • Scheduling Services
  • EMVS Online Training
  • Earned Value Workshops
  • Earned Value In-House Training
  • EVMS Education Center
  • Online Store
  • Humphreys Executive Management
  • Humphreys Professional Staff

Categories ▼ Recent Posts ▼

The responsibility assignment matrix (ram).

by Humphreys & Associates on November 26, 2013 last modified November 7, 2017

The RAM shows the WBS on one axis and the Organizational Breakdown Structure (OBS) on the other . The intersection of these axes designates who is responsible for what products or services and is known as the control account.  After detail planning is completed, the RAM is dollarized and then depicts the total budget for each CWBS element and the total budget for each respective control account manager .

The Responsibility Assignment Matrix not only helps ensure that someone is responsible for all contractual work scope ; it also verifies that there is only one individual assigned with responsibility for that work.  When developing a RAM, the level of the organization and the CWBS level should not be driven so low that costs to maintain the EVMS become excessive. Finding the most optimum balance of cost, schedule, and technical visibility generally provides the best definition for the control account.

The Responsibility Assignment Matrix is always a part of the data call information requested for EVMS reviews.  It is a good document to easily determine the value of control accounts as well as view them by organization/function and Contract Work Breakdown Structure (CWBS) element.

Traceability between the RAM and other program documentation must always be maintained .  The RAM is updated whenever there is a change to control account budgets.  The budget for a control account shown on the RAM should always equal the budget on the work authorization document for that control account.   The sum of all budgets identified to control accounts on the RAM should also equal the amount of distributed budget shown in the Contract Budget Base Log.  The sum of the control account budgets plus Undistributed Budget equals the Performance Measurement Baseline ( PMB ).   Finally, these budgets will trace to the Contract Performance Report (CPR) or the Integrated Program Management Report (IPMR) in Formats 1 and 2.

If you have any questions regarding the Responsibility Assignment Matrix (RAM) feel free to contact Humphreys & Associate s or leave a question on the blog.

Printer Friendly Version

Leave a Comment

Previous post: The Benefits of Using Nine EVMS Process Groups

Next post: Corrective Action Response: Sources – Part 1 of 2

Blog Search

Recent posts.

  • Introduction to the Cost and Software Data Reporting (CSDR) Reporting Requirements
  • The Role of EVM Consulting in Effectively Managing Projects Using Agile
  • Level of Effort (LOE) Best Practice Tips
  • Comprehensive Guide to EVMS Training 
  • Handling Authorized Unpriced Work (AUW) and Fee in Performance Reporting

EVMS Consulting & Training

  • EVMS Consulting Services
  • EVMS Training Courses
  • Earned Value Online Store

Stay Connected

  • Humphreys & Associates Blog
  • Join Our Newsletter
  • Follow us on Twitter
  • Like Us on Facebook
  • Connect to Us on LinkedIn
  • About Humphreys & Associates
  • Contact Humphreys & Associates
  • Terms and Conditions
  • Privacy Policy
  • Shipping and Returns
  • Complete Site Map
  • © 2024 Humphreys & Associates
  • © The R.E.P. Logo is a registered mark of PMI.

Creating the Responsibility Assignment Matrix (RAM) for Capital Projects Delivery

Published by tony on january 9, 2023 january 9, 2023.

One of the must requirements when it comes to managing any project is having the Responsibility Assignment Matrix (RAM). The main objective of the RAM is to detail the responsibilities of the different project stakeholders when it comes to performing the different project management processes across the project life cycle stages. The default responsibilities are Responsible (R), Accountable (A), Consult (C), and to be Informed (I). That is why the RAM is also known as the RACI chart.

PMWeb 7 Engineering Consultant

The values for those responsibilities could vary depending on what it is best suitable to explain the responsibility to be performed by the different stakeholders’ roles for the type of projects to be managed. For example, for capital projects, it is common to use the stakeholders’ responsibilities as responsible for performance (P), responsible for support and Assist (S), responsible for review and comments (R), responsible for Approval (A) or to be informed (I). Sometimes an organization might decide to expand the RAM to include the different stakeholders’ team members instead of having it summarized by the stakeholder entity.

Using Project Management Information Systems (PMIS) like PMWeb, organizations can improve the process for developing, reviewing and approving the RAM. Using PMWeb form builder, a form will be created to capture the RAM values for each project phase. The project management processes will be predefined based on the best practices and knowledge the organization has in developing the RAM. The responsibilities for each process need to be completed as per the requirements of the project being managed for which the responsibilities values can be selected from a predefined dropdown list.

responsibility assignment matrix (ram)

A workflow will be assigned to RAM form to ensure that the assigned stakeholders’ responsibilities are formally reviewed and approved. The processes for each project phase can be added into different tables in the created custom form. This will allow assigning different reviews and approval responsibilities in the workflow steps.

responsibility assignment matrix (ram)

As an option, it is highly recommended to also create the organization charts and the details of the project team reporting level that will be aligned with the responsibility assignment matrix. Of course, there could be different organization charts and RAM for each of the project life cycle phases that include design, tender, construction, testing and commissioning, and closeout. The PMWeb organization chart module will be used to create those organization charts.

responsibility assignment matrix (ram)

The responsibility assignment matrix (RAM) report details the assigned stakeholders’ responsibilities for each project management process within the project lifecycle phase. In addition, it includes four visuals to summarize the number of processes each stakeholder has a responsibility to perform and grouped by the type of responsibility which could be responsible for performance (P), responsible for support and assist (S), responsible for review and comments (R), responsible for approval (A) or to be informed (I). The report also allows filtering of the processes by project phase and process groups.

PMWeb7 Project Responsibility Assignment Matrix (RAM)

The world’s top organizations are selecting PMWeb because of its comprehensive features, functionality, and ease of use. Since 2007, PMWeb has been used by tens of thousands of users to manage their Plan | Build | Operate lifecycles.

Related Posts

responsibility assignment matrix (ram)

Blog Cost Management Costs Schedules Workflow

How cost-loaded schedules and project management information system (pmis) provide a real-time single-version-of-the-truth earned value management report.

The use of what is known as the cost-loaded schedule to establish the value of interim payment certificates is a growing trend among contractors as well as project owners who are involved in delivering capital Read more…

responsibility assignment matrix (ram)

Blog Cost Management Costs Forms

The great value of associating planned project outcomes with actual results when it comes to monitoring, evaluating and reporting the resources and cost performance of capital construction projects.

One of the key requirements when it comes to delivering capital construction projects is how to have a trust-worthy, auditable, real-time, single version of the truth monitoring, evaluating, and reporting the resources and cost performance Read more…

responsibility assignment matrix (ram)

Blog Costs Forms Portfolio Project Management Office (PMO) Tools Workflow

How can technology improve the situational awareness of project managers .

Indeed, a project manager’s ability to effectively manage uncertainty and stay informed about project developments is crucial. Construction projects become more detailed as they progress, with numerous uncertainties in the initial stages. A project manager Read more…

Privacy Overview

Drawing of Stakeholder map

Project Management Templates | FREE Downloads Word, Excel, PDF, Visio

  • 100s of tasks covering the whole project life cycle
  • Compatible with other Microsoft Project versions
  • Proven to save you time and deliver results
  • Software Development and Rollout
  • Business Events and Conference
  • Warehouse Construction
  • Website Design and Build
  • LEARN MORE!

buy ms project templates

Responsibility Assignment Matrix (RAM) Template | FREE Download

The Responsibility Assignment Matrix (RAM) shows 'who does what' on a work package or task. It is a popular tool because it shows what is expected of each member of the project team 'at a glance'. Scheduling tools like Microsoft project allow multiple resources to be linked to a task, but there is no easy way to show what each resource is expected to do - RAMs fill the gap. stakeholdermap.com
  • See a screenshot of the template
  • How to use the template
  • Download the Excel Template

Responsibility Assignment Matrix (RAM) Template

How to use the RAM template

  • Enter your project details on the first tab
  • Open the second tab named RAM
  • List your work packages down the left hand side (replacing Workpackage 1, 2, 3.. etc)
  • Enter the names of your project team in the columns. Replacing Person (1,2,3..)

Responsible

Accountable, what does raci stand for, what alternatives are there to raci, download the responsibility assignment matrix (ram) template, excel download - responsibility assignment matrix (ram) template (.xls), excel download - responsibility assignment matrix (ram) template (.xlsx), opendocument spreadsheet download - responsibility assignment matrix (ram) template (.ods), resource management plan template, resource planning template, resource requirements template, project templates to download.

  • Sample Project Charter - FREE example from a real software project
  • Excel Project Plan - FREE excel Gantt Chart template for project planning
  • WBS Checklist - Download a Free checklist for reviewing Work Breakdown Structures
  • Project Management Templates - View our collection of FREE templates for Project Managers
  • MS Project schedules - Get a ready made Microsoft Project Plan for your Project.
  • Risk Register template - Download a free Risk Register Template for managing your risks.
  • Software Project Plan - Get a ready Made Microsoft Project Plan for your Software Implementation Project.
  • Sample Statement of Work - Writing a SOW is challenging! That is why we are sharing this free example!
  • WBS examples - 22 Examples of real world Work Breakdown Structures.

Share this Image

Navigation Menu

Search code, repositories, users, issues, pull requests..., provide feedback.

We read every piece of feedback, and take your input very seriously.

Saved searches

Use saved searches to filter your results more quickly.

To see all available qualifiers, see our documentation .

  • Notifications

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement . We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

[Ceylin, Berkay] Create RAM diagrams #147

@berkaykeskino

ceylingebes commented Apr 26, 2024

@ceylingebes

Sorry, something went wrong.

@Mutti499

Mutti499 commented Apr 28, 2024

  • ❤️ 1 reaction

@ErayEroglu

ErayEroglu commented Apr 28, 2024

Ceylingebes commented apr 29, 2024.

@halil-karabacak

halil-karabacak commented Apr 29, 2024

No branches or pull requests

@halil-karabacak

LinkedIn

  • Shopping Cart: 0 Items

Responsibility Assignment Matrix (RAM)

Proudly Serving the EVM Community for 44 Years.

  • 714-685-1730 or Email Us
  • EVMS Newsletter Sign Up

Request a Free Consultation

All fields are required.

Humphreys & Associates is committed to the security of your information. View Privacy Policy

  • CAM Certification
  • EVMS Proposal Support
  • EVMS Requirements/Gap Analysis
  • EVMS Design and Documentation
  • EVMS Implementation
  • EVMS and Project Management Training
  • Preparation for an Integrated Baseline Review
  • Preparation for an EVMS Compliance Review
  • EVMS Staff Augmentation
  • Scheduling Services
  • Agile Consulting
  • Agile Training
  • Agile Framework Implementation
  • Agile-EVMS Integration
  • Agile Coaching
  • Agile Practioner Connection
  • Meet the Agile EVMS Team
  • EVMS Online Training
  • Earned Value Public Workshops
  • Earned Value In-House Training
  • EVMS Education Center
  • Online Store
  • Humphreys Executive Management
  • Humphreys Professional Staff
  • EVMS Careers

Articles & Media

Evms education center responsibility assignment matrix (ram).

  • Save to Profile    Share with a Friend    Rate this Article    Give us Feedback    Print Friendly Version

Upcoming EVMS Workshops

  • EVMS - Webinar_April
  • View Event Details
  • Scalable EVM
  • Advanced EVM Techniques - Webinar_June
  • CAM Discussion
  • EVMS Review

EVMS Education Center Latest Article

Humphreys & associates evms workshop reference materials - 2024.

US Government EVMS related regulation, policy, reporting, and other reference documents for H&A's EVMS workshops.

View Article

Earned Value Management Specialists since 1978

Humphreys & Associates, led by Gary Humphreys, is the established leader in earned value management consulting and training. H&A has provided consulting services to over 850 companies and government agencies worldwide and trained over 900,000 individuals at all functional and management levels.

Learn More About Humphreys & Associates

EVMS Consulting & Training

  • EVMS Consulting Services
  • EVMS Training Courses
  • Earned Value Online Store

Stay Connected

  • Humphreys & Associates Blog
  • Join Our Newsletter
  • Follow us on Twitter
  • Like Us on Facebook
  • Connect to Us on LinkedIn
  • About Humphreys & Associates
  • Contact Humphreys & Associates
  • Terms and Conditions
  • Privacy Policy
  • Shipping and Returns
  • Complete Site Map
  • © 2024 Humphreys & Associates
  • © The A.T.P. Logo is a registered mark of PMI.
  • Powered by CaliberCommerce enterprise ecommerce solution

CaliberCommerce

COMMENTS

  1. What Is A Responsibility Assignment Matrix (RAM)? Everything You Need

    The responsibility assignment matrix (RAM) is a form of project management that encourages everyone to understand every step of the project. Looking at the chart involves all parties and ...

  2. Responsibility assignment matrix

    Responsibility assignment matrix. In business and project management, a responsibility assignment matrix [1] ( RAM ), also known as RACI matrix [2] ( / ˈreɪsi /) or linear responsibility chart [3] ( LRC ), is a model that describes the participation by various roles in completing tasks or deliverables [4] for a project or business process.

  3. What Is a Responsibility Assignment Matrix (RAM) in Project Management?

    A Responsibility Assignment Matrix (RAM) is a tool used in project management to define and assign roles, responsibilities, and authority levels for each task or activity within a project. It includes columns for each team member's name, their role or title, their area of expertise or skill set, and any other pertinent information related to ...

  4. How to Make a Responsibility Assignment Matrix ...

    A responsibility assignment matrix (RAM) is a project management chart that defines the roles and responsibilities of people and organizations on a project. Learn what a RAM is, why you should create one, how to create one, and how to use a free template from ProjectManager.

  5. Responsibility Assignment Matrix (RAM)

    A Responsibility Assignment Matrix (RAM) describes the participation of various organizations, people, and their roles in completing tasks or deliverables in a Work Break Down Structure (WBS) for a project. A Responsible, Accountable, Consulted, and Informed (RACI) matrix is used on projects where multiple groups of people as assigned a task ...

  6. RACI Matrix: Responsibility Assignment Matrix Guide for 2024

    RACI is a project management acronym for the different responsibility types within a project: Responsible, Accountable, Consulted, and Informed. The RACI matrix clarifies the roles named individuals or groups will play in the successful delivery of the project. Accurate RACI matrices can help ensure a project's success before it even begins.

  7. The Responsibility Assignment Matrix (RAM)

    One tool that project managers use to keep these assignments clear is the Responsibility Assignment Matrix (also called the RAM, or the Responsibility Matrix). This matches deliverables with the people who are responsible for them. For every piece of the project, the matrix shows who needs to contribute what for the project to be completed.

  8. What Is a Responsibility Assignment Matrix (RAM)?

    A RAM is a tool for breaking down tasks into manageable pieces and assigning them to different roles and responsibilities. Learn the definition, benefits, and examples of a RAM, as well as the RACI model and the RACI chart.

  9. Responsibility Assignment Matrix with Excel RACI Template

    A responsibility assignment matrix (RAM) is a tool used in project management to clarify team and stakeholder roles for each project step. It paves the way for smooth collaboration by ensuring everyone knows what they need to do, who they need to talk to, and who has the final say on key decisions and deliverables. ...

  10. Responsibility Assignment Matrix (RAM)

    Figure 1 - The Responsibility Assignment Matrix (RAM) / RACI Matrix. To do this well and accurately, the matrix can be completed using the following steps: Step 1: Identify all the participants and (facilities) supporters of the project. Step 2: Identify all the deliverables for the project. Step 3: Discuss with all team members how they can ...

  11. A Project Management Guide for Everything RACI

    So basically the RACI matrix is a responsibility assignment matrix (RAM), designed to assign tasks, activities, responsibilities, accountability, decision making, support to team members of a process/project, and clarify expectations on the level of their participation." Here is an example of a RACI matrix:

  12. Responsibility Assignment Matrix: Advantages & Examples

    A Responsibility Assignment Matrix (RAM) in project management is a tool that outlines and defines the roles and responsibilities of individuals or groups involved in a project. Its purpose is to ensure that everyone understands their specific duties and tasks. The primary purpose of a RAM is to bring clarity to the project structure, helping ...

  13. RACI Chart: Definitions, Uses And Examples For Project ...

    A RACI chart, also called a RACI matrix, is a type of responsibility assignment matrix (RAM) in project management. In practice, it's a simple spreadsheet or table that lists all stakeholders on ...

  14. What is a Responsibility Assignment Matrix (RAM) in Project Management

    A responsibility assignment matrix (RAM) in project management is a key document that distinguishes stakeholders' roles and responsibilities. The RACI chart is the most popular example of a RAM that clarifies stakeholders' roles and defines their involvement. RACI stands for Responsible, Accountable, Consulted, and Informed.

  15. What is a Responsibility Assignment Matrix

    A Responsibility Assignment Matrix (RAM), sometimes known as a RACI chart, is a tool used in project management to keep track of all responsibilities assigned to cross-functional teams on a specific task or assignment. It's known as a RACI chart because its acronym names the four key roles displayed in the matrix:

  16. Responsibility Assignment Matrix: Template, Example & Benefits

    A Responsibility Assignment Matrix (RAM) is a tool used to identify and define the roles and responsibilities of individuals and groups within an organization. It is a means of clarifying who is responsible for what and ensuring that everyone understands their roles and responsibilities. RAM can be used to create accountability and ownership ...

  17. Responsibility Assignment Matrix (RAM)

    A Responsibility Assignment Matrix (RAM) is a project management tool used to define and assign roles and responsibilities to team members in a project or an organization. It helps to clarify expectations, enhance communication, and ensure that all tasks are assigned to the appropriate individuals. RAM is particularly useful in large, complex projects where multiple stakeholders are involved.

  18. The Responsibility Assignment Matrix

    The responsibility assignment matrix, also known as RAM, is a helpful tool used in project management to identify and clarify the roles and responsibilities of each team member. It ensures that every team member understands their duties and how they fit into the project plan. Using RAM in project management helps define roles and ...

  19. Responsibility Assignment Matrix (RAM) or RACI Chart Explained

    To learn how you can get PMP or CAPM certified in the next 6 weeks, sign up for a free class at https://www.examspm.com/free/ The Responsibility Assignment M...

  20. The Responsibility Assignment Matrix (RAM)

    The Responsibility Assignment Matrix (RAM) is a graphic representation that reflects the integration of project participants such as work teams, subcontractors, and internal organizations with individual Contract Work Breakdown Structure (CWBS) elements to form Control Accounts (CA).The RAM shows the WBS on one axis and the Organizational Breakdown Structure (OBS) on the other.

  21. Creating the Responsibility Assignment Matrix for Project Delivery

    The responsibility assignment matrix (RAM) report details the assigned stakeholders' responsibilities for each project management process within the project lifecycle phase. In addition, it includes four visuals to summarize the number of processes each stakeholder has a responsibility to perform and grouped by the type of responsibility ...

  22. Responsibility Assignment Matrix (RAM) Template

    The Responsibility Assignment Matrix (RAM) shows 'who does what' on a work package or task. It is a popular tool because it shows what is expected of each member of the project team 'at a glance'. Scheduling tools like Microsoft project allow multiple resources to be linked to a task, but there is no easy way to show what each resource is expected to do - RAMs fill the gap.

  23. The RACI Matrix Explained

    The RACI matrix is a project management tool used to define and clarify project roles and responsibilities. ... RACI metrics, responsibility assignment matrix (RAM), and project roles and ...

  24. [Ceylin, Berkay] Create RAM diagrams #147

    Responsibility Assignment Matrix (RAM) is an important diagram to track, review and make an assessment of distribution of responsibilities among team members; this task heavily requires attention and remembering completed tasks. Since it is highly open to overlook some responsibilities at past, feedbacks and thorough reviews are highly appreciated.

  25. Responsibility Assignment Matrix (RAM)

    The Responsibility Assignment Matrix (RAM) is a graphic representation that reflects the integration of project participants such as work teams, subcontractors, and internal organizations with individual Contract Work Breakdown Structure (CWBS) elements to form Control Accounts (CA). The RAM shows the WBS on one axis and the Organizational ...